Minimum Cut in the Project Network to Solve Time Cost Trade - Off Problem Using Renewable and Non Renewable Resources

Journal Title: UNKNOWN - Year 2015, Vol 4, Issue 1

Abstract

The time cost trade – off problem is one of the most important aspects of construction of project planning , scheduling and controlling. There are trade-offs between time and cost to complete the activities of a project. In general, the less expensive the resources used, the longer it takes to complete an activity. Using critical path method the overall project cost can be reduced by using less expensive resource for non-critical activities without impacting the project duration. Here a new solution procedure is introduced to solve the trade – off problems by using minimum cut or maximal flow concept. We find the minimum cuts for a acyclic graph which represents the critical path of the project by using the Karger’s fast algorithm of randomized minimum cut. The minimum cuts so obtained are used to trace the project activities which are to be reduced, in order to reduce the total project duration. The concept of renewable and non-renewable resources are used to minimize the project duration. The applicability of the proposed solution procedure is illustrated by an example.

Authors and Affiliations

Keywords

Related Articles

An Approach towards Improved Hyperspectral Image Denoising

Amount of noise included in a hyperspectral image limits its application and has a negative impact on hyperspectral image classification, unmixing, target detection, and so on. The data that are contaminated with noise c...

Estimates of Growth of Agricultural Sector in East Africa Pastoral Regions: Evidence from Ethiopia (Afar Regional State)

Employing commonly used national account estimation methodology we find livestock sub sector contributed the greatest share to the agricultural regional Real Gross Domestic Product which is 88.40 percent in 2010/11 and...

Performance and Exhaust Emission Analysis of Direct Injection Diesel Engine using Pongamia Oil Compared for Conventional Diesel

The use of biodiesel, the methyl esters of vegetable oils are becoming popular due to their low environmental impact and potential as a green alternative fuel for diesel engine. The aim of this study is to potential use...

A Robust Audio Digital Watermarking Algorithm based on Psychoacoustics Model

Digital watermark technology is now drawing attention as a new method of protecting digital content from unauthorized copying. A novel audio watermarking algorithm is used to protect against unauthorized copying of digit...

Heuristic Based Resource Allocation for Cloud Using Virtual Machines

"Cloud computing allows to estimate the scale of resources for business customers .We achieve this through Virtualization Technology. Virtualization can be provided significant benefits in data centers by enabling virtua...

Download PDF file
  • EP ID EP341641
  • DOI -
  • Views 70
  • Downloads 0

How To Cite

(2015). Minimum Cut in the Project Network to Solve Time Cost Trade - Off Problem Using Renewable and Non Renewable Resources. UNKNOWN, 4(1), -. https://europub.co.uk/articles/-A-341641