Mining Equipment Analysis to Reach Target Production on Overburden in Kutai Kertanegara East Borneo

Abstract

Mining equipment operations is one of the vital means to support target production determined. Early activities of mining is clearing land plants (overburden). Data have been obtained and analyzed based on literature related to the issue: there are geometry road calculate, time circulation, efficiency, productivity, equipment needs, compatibility and alternative combinations. Based on research results, value work efficiency of wheel loading and dump truck are 74.63% and 58.37%; productivity of 10 units of wheel loading 5.05BCM/hour and 25 units of dump truck 5.189 BCM/hour; 0.65 congeniality mining equipment with waiting time 6.61 minutes for wheel loading; Efforts to reached target production are: barriers improvements that occur and perform additional work time, so work efficiency wheel loading increased 76.97% with productivity 5.213 BCM/ hour and efficiency of dump truck increased 61.11% and productivity 5.432 BCM/hour; addition 2 units wheel loading increase productivity 5,867 BCM/hour; the other alternative combination tobe optimal productivity and obtain 4 (four) alternative combination mining equipment. Alternative combination of most optimal productivity is adding dump truck without changing wheel loading being 41 unit, productivity dump truck increased 8.909 BCM/hour and compatibility factor wheel loading and dump truck approaching 1.

Authors and Affiliations

Febe Franicha, Sutanto Hidayat, Tiong Iskandar

Keywords

Related Articles

Diagnosis and Inference of ADHD

Attention Deficit Hyperactivity Disorder (ADHD) may occur due to abnormal brain development or Brain injuries occurring before, during or after birth. Any brain damage or brain injury may cause abnormality in the growth...

Tradition And Updates In Human Resources Training System In Preuniversitary Institute

Through studies and research carried out in the framework of this paper, an attempt was made to highlight the need for professionalization of teaching activity, starting from the current situation and where we want to go...

Finite Element Analysis of Natural Vibration in Thin Aluminum Sheet

Thin aluminum sheet has a lot of applications in automobile industry, aerospace field, shipbuilding and offshore equipment. This thin sheet of aluminum is attractive for its light weight which will safe energy especially...

Green Buildings: The Future

Due to increase in green house gas emission and increasing climatic changes, the building architecture needs to change to keep up with the time. Green buildings are the future buildings. They utilize natural resources fo...

PV And Q V Curve Analysis Of IEEE 9 Bus System

Voltage Stability analysis of voltage instability in electric power system is very crucial in order to maintain the equilibrium of the system.Voltage security is the ability of the system to maintain adequate and control...

Download PDF file
  • EP ID EP392985
  • DOI 10.9790/9622-0712023644.
  • Views 86
  • Downloads 0

How To Cite

Febe Franicha, Sutanto Hidayat, Tiong Iskandar (2017). Mining Equipment Analysis to Reach Target Production on Overburden in Kutai Kertanegara East Borneo. International Journal of engineering Research and Applications, 7(12), 36-44. https://europub.co.uk/articles/-A-392985