Mixed Integer Programming Approaches to Planning and Scheduling in Electronics Supply Chains
Journal Title: Decision Making in Manufacturing and Services - Year 2017, Vol 11, Issue 1
Abstract
This paper discusses mixed integer programming (MIP) approaches to planning and scheduling in electronics supply chains. First, the short-term detailed scheduling of wafer fabrication in semiconductor manufacturing and detailed scheduling of printed wiring boards assembly in surface mount technology lines are discussed. Then, the medium-term aggregate production planning in a production/assembly facility of consumer electronics supply chain is described, and finally coordinated aggregate planning and scheduling of manufacturing and supply of parts and production of finished products is presented. The decision variables are defined and MIP modelling frameworks provided. The two decision-making approaches are discussed and compared: integrated (simultaneous) approach, in which all required decisions are made simultaneously using a complex, large monolithic MIP model; and hierarchical (sequential) approach, in which the required decisions are made successively, using hierarchies of simpler and smaller-size MIP models. The paper highlights also the research on stochastic MIP applications to planning and scheduling in electronics supply chains with disrupted material and information flows due to natural or man-made disasters.
Authors and Affiliations
Tadeusz Sawik
On Public Values and Power Indices
In this paper we analyze, from a different point of view, some values and power indices well defined in the social context where the goods are public. In particular we consider the Public Good index (Holler, 1982), the P...
Scheduling with High Variety of Customized Compound Products
Domestic appliance is an instance of manufacturing various products on clients demand with frequent changes of production. Although the technological process for each individual product is relatively simply, the variety...
A Utility Function to Solve Approximate Linear Equations for Decision Making
Suppose there are a number of decision variables linearly related to a set of outcome variables. There are at least as many outcome variables as the number of decision variables since all decisions are outcomes by themse...
Manpower Planning with Annualized Hours Flexibility: A Fuzzy Mathematical Programming Approach
We have considered the problem of annualized hours (AH) in workforce management. AH is a method of distributing working hours with respect to the demand over a year. In this paper, the basic Manpower planning problem wit...
Coordinating Contracts in SCM: A Review of Methods and Literature
Supply chain coordination through contracts has been a burgeoning area of re- search in recent years. In spite of rapid development of research, there are only a few structured analyses of assumptions, methods, and appli...