MODEL FOR MANAGING SOFTWARE DEVELOPMENT PROJECTS BY FIXING SOME OF THE SIX PROJECT MANAGEMENT CONSTRAINTS

Journal Title: Journal of Information Technology and Application (JITA) - Year 2011, Vol 1, Issue 1

Abstract

This study is focused on the software development process, viewed from perspective of information technology project manager. Main goal of this research is to identify challenges in managing such projects and provide a model for delivering software solutions that satisfi es client’s expectations. Project management theory describes six constraints or variables in every project, which project managers can use to better control the project and its outputs. Fixing some of the six project management constraints (scope, cost, time, risks, resources or quality) will allow project manager to focus on most important project aspects, rather than being drawn between all of the variables.This paper is aimed at information technology project managers and portfolio managers, as it describes the practical application of this model on a software development project. Findings of this research support the theory that, by applying good project management practice and focusing on project/business-critical requirements, will enable project managers to complete projects successfully and within tolerance limits. Results show that by identifying key business constraints, project managers can create good balance of six constraints and focus on the most important ones, while allowing other constraints to move between limits imposed by clients and stakeholders.

Authors and Affiliations

Boris Todorović, Miroslav Matić

Keywords

Related Articles

APPLICATIONS OF SMARTPHONES FOR UBIQUITOUS HEALTH MONITORING AND WELLBEING MANAGEMENT

Advances in smartphone technology and data communications facilitate the use of ubiquitous health monitoring and mobile health application as a solution of choice for the overwhelming problems of the healthcare system. I...

ON INTRUSION DETECTION IN A NEIGHBOURHOOD AREA NETWORK IN THE SMART GRID

Smart grid, which is an upgrade of power electric system, mainly relies on powerful communication networks to provide a secure, reliable and effi cient information delivery. Updating a system as complex as the electrical...

FULL TEXT SEARCH AND INDEXING IN LANGUAGES WITH TWO ALPHABETS

The languages spoken in Bosnia and Herzegovina use both Cyrillic and Latin equally. This is an additional problem with indexing and full text searching. In this paper, we are analyzing this problem. Using the tools avail...

DIGITAL SIGNAL PROCESSING APPLICATIONS WITH ITERATIVE LOGARITHMIC MULTIPLIERS

Many digital signal processing applications demand a huge number of multiplications, which are time, power and area consuming. But input data is often corrupted with noise, which means that a few least signifi cant bits...

R oad Traffic Acc idents Analysis Using Data Mining Techniques

Road Traffic Accidents (RTAs) are a major public concern, resulting in an estimated 1.2 million deaths and 50 million injuries worldwide each year. In the developing world, RTAs are among the leading cause of death and i...

Download PDF file
  • EP ID EP244660
  • DOI -
  • Views 114
  • Downloads 0

How To Cite

Boris Todorović, Miroslav Matić (2011). MODEL FOR MANAGING SOFTWARE DEVELOPMENT PROJECTS BY FIXING SOME OF THE SIX PROJECT MANAGEMENT CONSTRAINTS. Journal of Information Technology and Application (JITA), 1(1), 33-40. https://europub.co.uk/articles/-A-244660