Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource

Journal Title: International Journal of Innovation in Engineering (IJIE) - Year 2021, Vol 1, Issue 4

Abstract

In this paper, an uninterrupted hybrid flow scheduling problem is modeled under uncertainty conditions. Due to the uncertainty of processing time in workshops, fuzzy programming method has been used to control the parameters of processing time and preparation time. In the proposed model, there are several jobs that must be processed by machines and workers, respectively. The main purpose of the proposed model is to determine the correct sequence of operations and assign operations to each machine and each worker at each stage, so that the total completion time (Cmax) is minimized. Also this paper, fuzzy programming method is used for control unspecified parameter has been used from GAMS software to solve sample problems. The results of problem solving in small and medium dimensions show that with increasing uncertainty, the amount of processing time and consequently the completion time increases. Increases from the whole work. On the other hand, with the increase in the number of machines and workers in each stage due to the high efficiency of the machines, the completion time of all works has decreased. Innovations in this paper include uninterrupted hybrid flow storage scheduling with respect to fuzzy processing time and preparation time in addition to payment time. The allocation of workers and machines to jobs is another innovation of this article.

Authors and Affiliations

Paria Samadi Parviznejad,Ezzatollah Asgharizadeh,

Keywords

Related Articles

An IoT-based sustainable supply chain framework and blockchain

The increasing expansion of the needs of human beings and societies has caused various aspects of human life and societies to face serious challenges and be considered. Supply chain organizations operate in a market in t...

Effect of Mentoring on the Growth of Selected Small Scale Businesses in Makurdi Metropolis, Benue State-Nigeria

Strategies for developing the capabilities of employees are important part of any organization’s overall strategy and source of competitive advantage. This study investigated the effect of mentoring on the growth of se...

Investigating the value level of pharmaceutical companies in Tehran Stock Exchange

The main purpose of this research is to examine the relationship between human resources productivity and the value level of companies admitted to the stock market of Tehran Stock Exchange. The methods of library study a...

Investigation of the Effects of Nano Silica Particles and Zeolite on the Mechanical Strengths of Metakaolin-Based Geopolymer Concrete

Due to its unique qualities, concrete is the most extensively utilized substance in the construction sector after water. However, because one ton of Portland cement produces about one ton of CO2, the Portland cement manu...

Analysis of surface roughness and material removal rate in machining of AISI 1040 steel using CNC turning process

The present study investigates the effect of turning process parameters on the surface roughness and metal removal rate (MRR) of the AISI 1040 steel. Twenty-seven ( L27) runs based on an orthogonal array of Taguchi techn...

Download PDF file
  • EP ID EP711463
  • DOI -
  • Views 46
  • Downloads 0

How To Cite

Paria Samadi Parviznejad, Ezzatollah Asgharizadeh, (2021). Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource. International Journal of Innovation in Engineering (IJIE), 1(4), -. https://europub.co.uk/articles/-A-711463