MODELING APPROACH TO SIMULTANEOUS SCHEDULING BATTERIES AND VEHICLES IN MATERIALS HANDLING SYSTEMS
Journal Title: INTERNATIONAL JOURNAL FOR TRAFFIC AND TRANSPORT ENGINEERING - Year 2015, Vol 5, Issue 1
Abstract
Battery operated handling equipment is the most widely applied concept in materials handling and logistic systems in general. The problem related to its application is in defining the most appropriate scheduling batteries and vehicles to handling tasks. Although the problem can be found in literature very often as very important, solution approaches are very rare and almost don’t exist. This paper presents one of possible solving approaches to the problem, considering the optimal assignment of resources (batteries and vehicles) to material handling tasks. Modeling approach proposed is illustrated by a few numerical examples.
Authors and Affiliations
Milorad Vidović, Branislava Ratković
EQUIVALENCY FACTOR USING OPTIMIZATION FOR INDIAN MIXED TRAFFIC CONDITION
The term Equivalency Factor as PCE was introduced in the 1965 by HCM. And after that, considerable research effort has been carried toward to estimate PCE value. The present empirical study is to determine the dynamic eq...
ANALYSIS OF DIFFERENT LOADS AFFECTING THE URBAN RAILWAY TUNNEL SYSTEMS OF CAIRO METRO UNDERNEATH THE RIVER NILE
The study objective of this paper is analysis of different loads affecting the urban railway tunnel systems to determine the optimum tunnel system (single tunnel or twin tunnel). A case study is The Greater Cairo metro l...
INVESTIGATION OF PERFORMANCE AND LANE UTILIZATION WITHIN A PASSING LANE ON A TWO LANE RURAL HIGHWAY
An investigation into platooning and passing maneuvers within a passing lane section on a rural two-lane, two-way highway was considered in this study. The study site was located on US Highway 287 between the town of Tow...
DISCOURSE OF VHF COMMUNICATION AT SEA AND THE INTERCULTURAL ASPECT
Discourse analysis of real examples of internal and external communication at sea represents a real challenge for linguists. Research in this field is at its very beginning and was partially presented in the final report...
ANALIZA FUNKCIJE "BRZINA-TOK" POVREMENO PREKINUTOG, FORSIRANOG SAOBRAĆAJNOG TOKA NEHOMOGENE STRUKTURE ZA GRADSKE SAOBRAĆAJNICE
Funkcije "brzina-tok" definisane su od strane više eksperata iz oblasti saobraćaja sa ciljem preciznog predviđanja brzine na gradskoj putnoj mreži. HCM "brzina-tok" kriva, BPR kriva, MTC "brzina-tok" kriva, Akçelik "brzi...