MODERN APPROACHES TO THE PRELIMINARY ASSESSMENT OF INVESTMENT BUILDING PROJECTS WITH THE STOCHASTICITY OF PROCESSES
Journal Title: Нові технології в будівництві - Year 2018, Vol 34, Issue
Abstract
The works devoted to the issues of preliminary assessment of investment and construction projects are analyzed. The analysis of the specifics of the development and implementation of investment and construction projects, the functions of the risk management system and risk management mechanisms. The solution of the task of modeling the process of implementing investment and construction projects, taking into account the stochasticity of processes, risks and uncertainty with the use of a mathematical apparatus that ensures the adequacy of the models being created and the correctness of the results, namely: with the use of theories of expert assessments, fuzzy logic and multicriteria optimization, will increase the level of reliability of the adopted organizational, technological and management decisions.
Authors and Affiliations
В. В. Ковалев, О. В. Кирнос
ANALYSIS OF CURRENT CONDITIONS AND REQUIREMENTS FOR MAINTENANCE OF HEAT SUPPLY NETWORKS IN UKRAINE
he authors analyzed the current state of heat supply systems in Ukraine in the article. The article describes main causes of damage to heating systems and groups of factors that affect the indicators of opera tional rel...
STUDY OF THE REASONS OF MIXING OF CONCRETE CONSTRUCTIONS IN AGGRESSIVE ENVIRONMENTS
Complex influence of biological and hygrometric factors leads to intensive destruction of concrete. The grid of cracks grows continuously under certain conditions, sometimes reaching 10 ...20 cm/day. It is characteristi...
RESEARCH OF THE LAWS OF STRUCTURE FORMATION IN THE TECHNOLOGY OF DISPERSE CONSTRUCTION MATERIALS
It is known that construction composite materials (mortars and concretes based on mineral ororganic cements, slips for making ceramics, coating compositions and many other such dispersions) may be approached as selforg...
INVESTIGATION OF CONSTRUCTIONS OF THE UNDERGROUND HYDROTECHNICAL TUNNEL OF TEREBILRITSKAYA HPP AND ADJACENT MOUNTAINOUS MASSES USING THE RADIO WAVE METHOD
The research institute of construction production made geophysical works in order to identify the weakened soil zones adjacent to the body of the TerebleRitskaya HPS tunnel, Khust district of the Zakarpattia region. Ge...
DEVELOPMENT OF ALGORITHMIC STRUCTURE OF SIMULATION OF COMPLEX PROCESS OF DETERMINATION OF PARAMETERS OF BUILDINGS, STRUCTURES AND TERRITORY OF BUILDING BY INSTRUMENTAL METHODS
DEVELOPMENT OF ALGORITHMIC STRUCTURE OF SIMULATION OF COMPLEX PROCESS OF DETERMINATION OF PARAMETERS OF BUILDINGS, STRUCTURES AND TERRITORY OF BUILDING BY INSTRUMENTAL METHODS Abstract. In the article the algorithm of mo...