MODERN APPROACHES TO THE PRELIMINARY ASSESSMENT OF INVESTMENT BUILDING PROJECTS WITH THE STOCHASTICITY OF PROCESSES
Journal Title: Нові технології в будівництві - Year 2018, Vol 34, Issue
Abstract
The works devoted to the issues of preliminary assessment of investment and construction projects are analyzed. The analysis of the specifics of the development and implementation of investment and construction projects, the functions of the risk management system and risk management mechanisms. The solution of the task of modeling the process of implementing investment and construction projects, taking into account the stochasticity of processes, risks and uncertainty with the use of a mathematical apparatus that ensures the adequacy of the models being created and the correctness of the results, namely: with the use of theories of expert assessments, fuzzy logic and multicriteria optimization, will increase the level of reliability of the adopted organizational, technological and management decisions.
Authors and Affiliations
В. В. Ковалев, О. В. Кирнос
TECHNOLOGY DEVELOPMENT CONTINUOUS ANTIFILTRATION SCREEN
The technology of the device of a continuous antifiltration screen under existing buildings and structures, which are located in areas subject to flooding, has been developed. The use of well boring under slope and the...
ANALYSIS OF CURRENT CONDITIONS AND REQUIREMENTS FOR MAINTENANCE OF HEAT SUPPLY NETWORKS IN UKRAINE
he authors analyzed the current state of heat supply systems in Ukraine in the article. The article describes main causes of damage to heating systems and groups of factors that affect the indicators of opera tional rel...
RESEARCH ON THE IMPACT OF TECHNOLOGICAL PARAMETERS INJECTION HYDRAULIC INSULATION IN THE ZONE OF DISTRIBUTION
The article is devoted to studies of the influence of technological parameters of injection the technology of the device of the waterproofing system to the intensity of the zone change strangeness Are the results of the...
DEVELOPMENT OF ALGORITHMIC STRUCTURE OF SIMULATION OF COMPLEX PROCESS OF DETERMINATION OF PARAMETERS OF BUILDINGS, STRUCTURES AND TERRITORY OF BUILDING BY INSTRUMENTAL METHODS
DEVELOPMENT OF ALGORITHMIC STRUCTURE OF SIMULATION OF COMPLEX PROCESS OF DETERMINATION OF PARAMETERS OF BUILDINGS, STRUCTURES AND TERRITORY OF BUILDING BY INSTRUMENTAL METHODS Abstract. In the article the algorithm of mo...
INVESTIGATION OF CONSTRUCTIONS OF THE UNDERGROUND HYDROTECHNICAL TUNNEL OF TEREBILRITSKAYA HPP AND ADJACENT MOUNTAINOUS MASSES USING THE RADIO WAVE METHOD
The research institute of construction production made geophysical works in order to identify the weakened soil zones adjacent to the body of the TerebleRitskaya HPS tunnel, Khust district of the Zakarpattia region. Ge...