Modified optimization model for selecting project risk response strategies

Journal Title: Operations Research and Decisions - Year 2017, Vol 27, Issue 2

Abstract

The authors present modifications of the optimization model for selecting project risk response strategies proposed by Zhang and Fan. The weaknesses of the original model has been identified and an improved model with the main suggestions has been proposed. The main improvement concerned the objective function. The modified model was tested using a real project in the electrical industry – engineering and construction of the main low voltage witchboard for a live fish carrier (Helix Q7000) in Norway. Project team members report that the analysis is time consuming but results are satisfying – the model allows more systematic and efficient risk management.

Authors and Affiliations

Ewa MARCHWICKA, Dorota KUCHTA

Keywords

Related Articles

A multifaceted analysis of the electoral system of the Republic of Suriname

The electoral system of Suriname has been analyzed. Suriname has a unicameral parliament, the National Assembly. The 51 seats of the National Assembly are distributed among 10 districts. There are large discrepancies bet...

Localizing of the atmospheric contamination source based on the Kori field tracer experiment data

Accidental releases of hazardous material into the atmosphere pose high risks to human health and the environment. Thus it would be valuable to develop an emergency reaction system which can recognize the probable locati...

An integrated dynamic weighing system based on SCADA

For this reason, there is a lot of research concerned with weighing signal processing, mechanical mattersA prototyped dynamic weighing system has been presented which integrates together three advanced software environme...

Probabilistic characteristics supporting the management of a production-supply system

The construction of a model and quantitative measures have been presented aimed at improving the efficiency of a production-supply system described by a three-dimensional stochastic process. For this purpose, the laws go...

A Bayesian model of group decision-making

A change in the opinion of a group, treated as a network of communicating agents, caused by the accumulation of new information is expected to depend on communication within the group, coopera-tion and, possibly, a kind...

Download PDF file
  • EP ID EP323657
  • DOI -
  • Views 33
  • Downloads 0

How To Cite

Ewa MARCHWICKA, Dorota KUCHTA (2017). Modified optimization model for selecting project risk response strategies. Operations Research and Decisions, 27(2), 77-90. https://europub.co.uk/articles/-A-323657