Multi-objective Optimization of Combined Gray-green Infrastructure Rainwater System for Yuhuazhai Depot of Xi’an Metro

Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 1

Abstract

[Objective] Acceleration of the urbanization process and frequent occurrence of urban flood disasters impose higher requirements on the rainwater system of urban rail transit depots. It is necessary to conduct a detailed study on the schemes of the depot rainwater system. [Method] Based on the rainwater management concept by combining gray infrastructure and green infrastructure, the hydrological simulation software SWMM (storm water management model) is used to simulate the hydrological processes under various combination schemes for Yuhuazhai Depot of Xi’an Metro Line 3. A multi-objective optimization method is designed through the response surface method. Combined with the particle swarm optimization algorithm, the Matlab software is used to optimize the configuration of the green infrastructure within the depot in order to achieve effective control over the total runoff volume, peak flood, TSS (total suspended solids) and costs. [Result & Conclusion] Through multi-objective optimization and comparison, the optimal gray-green combination rainwater system scheme for Yuhuazhai Depot of Xi’an Metro is determined. In particular, the combined layout of permeable pavements and retention ponds should be given priority within the depot. This scheme not only meets the requirements of GB 51345—2018 Assessment Standard for Sponge City Construction Effect, but also maximizes the economic benefits.

Authors and Affiliations

Jiajie LYU

Keywords

Related Articles

Construction and Operation Development of Low-Capacity Urban Rail Transit System

[Objective] With the advantages of diverse functional positioning, flexible line layout, economic and environmental protection, low-carbon, etc., the low-capacity urban rail transit system has become an important part...

Simulation Analysis of A Metro Station Construction in Shenzhen with Small TBM Advancing Excavation Followed by Large TBM Enlargement

[Objective] The new technique of small-diameter TBM (tunnel boring machine) advancing excavations followed by large-diameter TBM enlargement is used for the first time in the construction of Tumor Hospital Station on She...

Influencing Factors and Control Effects of Targeted Grouting Technology for Underground-excavated Metro Station Construction

[Objective] In conventional grouting construction technology, the ineffective diffusion of grout is comparatively severe and leads to unsatisfactory reinforcement effects on surrounding rock and soil mass. Therefore, it...

Research on the Impact of Wheel Polygonalization on Metro Bogies

Objective The objective is to investigate the impact of wheel polygonalization on metro bogies, thereby strengthening the control requirements for wheel polygonalization, and enhancing the operational quality and safety...

Influence of Large-scale Foundation Pit Sloping Excavation on Adjacent Operating Metro Tunnel and Actual Measurement Analysis

Objective There are complex coupling effects between foundation pit and tunnel due to different construction processes. The foundation pit construction will inevitably cause disturbance to the existing operation tunnel,...

Download PDF file
  • EP ID EP755008
  • DOI 10.16037/j.1007-869x.2025.01.031
  • Views 9
  • Downloads 0

How To Cite

Jiajie LYU (2025). Multi-objective Optimization of Combined Gray-green Infrastructure Rainwater System for Yuhuazhai Depot of Xi’an Metro. Urban Mass Transit, 28(1), -. https://europub.co.uk/articles/-A-755008