Analysis of Factors Influencing Productivity: Survey of Construction Projects in Central Gujarat Region of India

Abstract

 - Productivity in construction projects is usually an economic measure which acts as a game changer. Productivity can be an influential factor in minimizing the project losses or increased profits. A loss of billions of rupees every year is occurred due to loss or lack of productivity. In spite of various researches been done in the last decade, a deeper understanding can help to improve the productivity. Productivity helps in attaining the maximum possible efficiency and thus can help in reduction of time, effort etc. Productivity can help a company gain competitive advantage and slim profit margins. Hence, to gain an advantage in profit, productivity study is important. The aim of this study was to get the latest information, identify and rank the key factors affecting the project level productivity. This paper presents various factors affecting construction productivity ranked in accordance with the most affecting factors based on a survey. It also gives interrelations between the perspectives of owners, engineers, etc. Such a study may prove to be beneficial to all the agencies involved in construction by a providing a benchmark for achieving necessary productivity and also act as a foundation for future studies.

Authors and Affiliations

Meet P. Shah*1

Keywords

Related Articles

  WSN ROUTING PROTOCOLS: A REVIEW

 WSN is a set of connected tiny devices (sensor nodes) with limited energy resource. WSNs have ability to extract the information from the harsh and hostile environment without human interaction. Once, WSN is deplo...

SUPPLIER SELECTION PROCESS IN THE CONSTRUCTION MATERIAL PURCHASING FUNCTION

Construction materials occupy a significant part of the construction’s value contributing nearly 50%. Thus when selecting construction materials, it is very important that correct decisions should be made. Literature...

 Comparative Study on AC Square and Three-Level Wave Form of Photovoltaic and Wind Power Hybrid Single Phase Inverter

 This paper presents a new topology of three-level single phase photovoltaic (PV) and wind power hybrid inverter. It consists of four main circuits; they are a hybrid controller circuit, a charger circuit, a pulse...

 BRAIN MACHINE INTERFACING WITH IoT FUNTIONALITY

 Brain dead people and people having any disability related to brain cannot normally communicate with others and for their betterment some electronic need to be developed and Brain Machine Interfacing (BMI) is...

 COLOUR FASTNESS PROPERTIES OF MORDANTS AND MORDANTING METHODS WHEN DYED WITH USED TEA LEAVES ON SILK FABRIC

 Awareness about environmental concerns and ill effects on health caused by synthetic dyes has made the natural dyes comeback. Many natural materials from plant and animal sources are being identified as possible c...

Download PDF file
  • EP ID EP127684
  • DOI -
  • Views 30
  • Downloads 0

How To Cite

Meet P. Shah*1 (30).  Analysis of Factors Influencing Productivity: Survey of Construction Projects in Central Gujarat Region of India. International Journal of Engineering Sciences & Research Technology, 3(4), 3082-3087. https://europub.co.uk/articles/-A-127684