[b]Analysis of Two Unit Standby Oil Delivering System with Two Types of Repair Facility and Priority is Given to Partially Failed Unit with Provision of Switching Over to Another System[/b]

Abstract

 This paper develops a model for two unit standby oil delivering system. The system can be failed with three types of failure complete failure, normal to partial failure and Partial to complete failure. Initially one unit is operative and the other is standby. In case of partial failure, inspection is carried out to check whether online or off line repair can be done and priority is given to partially failed unit for repair. On the complete failure of both the units there is a provision of switching over to the other similar system. This practical situation may be observed in an oil refinery plant. The system is analyzed by making use of semi-Markov processes and regenerative point technique

Authors and Affiliations

Dr. Rekha Narang

Keywords

Related Articles

 Cement Stabilization of Laterite and Chikoko Soils Using Waste Rubber Fibre

 This paper presents a study of cement stabilization of laterite and Chikoko soils using waste shredded rubber tyre chips as the reinforcement material at 5%, 10% and 15% fibre content by weight of soil. Tests cond...

 A Verilog Design in FPGA Implementation Of Quadrature Phase Shift Keying (QPSK) Digital Modulator

 The objective of this project deals with the design & implementation of a verilog design of QPSK Digital Modulator based on the FPGA Quartus-II simulator. Digital modulation is less complex, more secure and mo...

 Analysing the Mechanical Properties of Natural Fiber Reinforced Polymer Composites Using FEA

 Over the last thirty years composite materials such as polymer, alloys and ceramics have been the dominant emerging materials. The volume and number of applications of Composite materials have grown steadily, pen...

 A Survey on Black hole Attack Detection Methods

 MANET(Mobile Ad Hoc Networks) is important and growing technology, because of its characteristics such as mobility, easy deployment, also it doesn’t required any centralized management and predefined infrastructur...

 AN EXPERIMENTAL STUDY ON STRENGTH PERFORMANCE OF CONCRETE(M20) WITH PARTIAL REPLACEMENT OF FINE AGGREGATE WITH POND ASH

 Power consumption is increasing day by day for utilization. Power is generated from different power plants such as Thermal power plants, hydraulic power plants, solar power plants and etc…, A major portion of the...

Download PDF file
  • EP ID EP95320
  • DOI -
  • Views 48
  • Downloads 0

How To Cite

Dr. Rekha Narang (30).  [b]Analysis of Two Unit Standby Oil Delivering System with Two Types of Repair Facility and Priority is Given to Partially Failed Unit with Provision of Switching Over to Another System[/b]. International Journal of Engineering Sciences & Research Technology, 3(6), 117-123. https://europub.co.uk/articles/-A-95320