COMPARATIVE STUDY ON PLANNING, SCHEDULING & RESOURCE ALLOCATION OF A LIVE PROJECT WITH UPCOMING PROJECT OF SAME ASPECT

Abstract

 The Aim of this study is to compare the actual project done with upcoming project in terms of planning, scheduling and resource allocating with respect to TIME & Cost. The actual project was subjected to a financial break up as a result, delay of project was observed. Now assuming that if financial break ups would not have occurred & allocation of resources would have done according to IS 7272 by taking CPWD rates 2014 then, best result was obtained w.r.t. time-cost for each activity in W.B.S. so for upcoming project which has same specification as actual project already done, new project duration, planning and resource allocation is performed & results are studied. Results are giving too main heading’s 1. Amount saved on activity along with crashing & durations 2. Amount invested on activity to achieve desired duration. For this , total amount saved on project resource is compared to total amount invested to achieve target duration for upcoming project. Also, indirect cost which includes only the salary packages of PMC is also considered along with resource costing

Authors and Affiliations

Mohammed Nabeel Khan

Keywords

Related Articles

 Value Decomposition and Dimension Selection in Multi-Dimensional Datasets using Map-Reduce Operation

 The datasets which are in the form of object-attribute-time format is referred to as three-dimensional (3D) data sets. Clustering these three-dimensional (3D) data sets is a difficult task. So the subspace cluster...

 Development of an Web based ERP module for an Educational Institute: A case of Training & Placement (TNP) Cell

This paper deals with the Development of an Web based Enterprise Resource planning (ERP) module for an Educational Institute: A case of Training & Placement (TNP)cell. An ERP system contains various modules in any...

Programming Language and Artificial Intelligence Development

The term language means communication tool which is used to write Computer program and develop application, scripts, or other set of instructions for a computer to execute. Computer programming languages are used to wr...

Voltage and Frequency Scaling in Low Power VLSI

In micro electronics design, power consumption, speed of operation, are crucial constraints. Propagation delay of circuit component has an impact on such factors. This paper investigates the effect of supply and thresho...

Design of Compact Printed slot Antenna for Ultra Wideband Applications

The design and performance of a printed slot antenna in the ultrawideband is presented in this article. The proposed design consists of an octagonal band (3.1–10.6 GHz). The impedance patterns are stable and bidirecti...

Download PDF file
  • EP ID EP107326
  • DOI 10.5281/zenodo.165008
  • Views 53
  • Downloads 0

How To Cite

Mohammed Nabeel Khan (30).  COMPARATIVE STUDY ON PLANNING, SCHEDULING & RESOURCE ALLOCATION OF A LIVE PROJECT WITH UPCOMING PROJECT OF SAME ASPECT. International Journal of Engineering Sciences & Research Technology, 5(11), 206-225. https://europub.co.uk/articles/-A-107326