COMPARATIVE STUDY ON PLANNING, SCHEDULING & RESOURCE ALLOCATION OF A LIVE PROJECT WITH UPCOMING PROJECT OF SAME ASPECT

Abstract

 The Aim of this study is to compare the actual project done with upcoming project in terms of planning, scheduling and resource allocating with respect to TIME & Cost. The actual project was subjected to a financial break up as a result, delay of project was observed. Now assuming that if financial break ups would not have occurred & allocation of resources would have done according to IS 7272 by taking CPWD rates 2014 then, best result was obtained w.r.t. time-cost for each activity in W.B.S. so for upcoming project which has same specification as actual project already done, new project duration, planning and resource allocation is performed & results are studied. Results are giving too main heading’s 1. Amount saved on activity along with crashing & durations 2. Amount invested on activity to achieve desired duration. For this , total amount saved on project resource is compared to total amount invested to achieve target duration for upcoming project. Also, indirect cost which includes only the salary packages of PMC is also considered along with resource costing

Authors and Affiliations

Mohammed Nabeel Khan

Keywords

Related Articles

 EDUCATION MECHANISMS CAVITATIONAL ZONES BY MENAS OF ASPHALTHEN- PITCH -WAX DEPOSITS ON A SURFACE TO A PIPELINES

 In work the major factors influencing on are listed formation of APWD. The special attention is paid to a group chemical composition of initial raw materials and mutual influence of separate high-molecular compone...

 Effect of Clipping Ratio on Bit Error Rate Performance of Clipped and Filtered OFDM Signal

 Wireless communications is regarded as the most important development with wide range of applications. Advances and development in this field aim for fast and reliable communication. Orthogonal frequency division...

 Enhancement the Performance of Condenser of Split type Air Conditioning System by using Evaporative Cooling: A Review

 The improvement of coefficient of performance and reduction of energy consumption of a split air conditioning system. When retrofitted with evaporative cooling in the condenser of split air conditioner is reviewed...

EXPERIMENTAL STUDIES ON PERFORMANCE CHARACTERISTICS OF THERMO - ELECTRIC GENERATOR USED IN COMPRESSION IGNITION ENGINES

This paper deals with the study on performance characteristics of thermo-electric generator modules used in Compression Ignition engines for production of an electrical energy. Exhaustive studies are being done in ut...

 PERFORMANCE ANALYSIS OF ZF AND MMSE DECODERS AND ANALYSING THE BER FOR MIMO SYSTEMS

 A leading breakthrough in wireless communications has come into existence with the help of Multiple Inputs Multiple Output (MIMO) Systems. It is aimed to achieve a high data rate with a high spectral efficiency wi...

Download PDF file
  • EP ID EP107326
  • DOI 10.5281/zenodo.165008
  • Views 31
  • Downloads 0

How To Cite

Mohammed Nabeel Khan (30).  COMPARATIVE STUDY ON PLANNING, SCHEDULING & RESOURCE ALLOCATION OF A LIVE PROJECT WITH UPCOMING PROJECT OF SAME ASPECT. International Journal of Engineering Sciences & Research Technology, 5(11), 206-225. https://europub.co.uk/articles/-A-107326