Abstract

 In this paper, the Batch Processing Machine (BPMs) and its scheduling problem in a semiconductor wafer fabrication facility (fab) has been focused ,where in there are many BPMs, such as diffusion machines, oxidation machines and dry strip machines. The jobs processed on those machines cannot be batched together unless they use they have the same recipe of those BPMs. As a result, the scheduling problem of those BPMs is abstracted as identical PBPM with incompatible job families. In a fab, because most of upstream and downstream machines of the BPMs are non-BPMs, jobs must be batched or split regularly during their fabrication processes. Therefore, a good scheduling solution of those BPMs is important to efficiently utilize their capacity and satisfy the requirements of their downstream machines to balance the fab-wide workload and achieve better fab-wide operational performance.

Authors and Affiliations

Rutuja Kulkarni

Keywords

Related Articles

 SELF CONTROLLED ROBOT FOR MILITARY PURPOSE USING PIC MICROCONTROLLER

 Self-controlled robots are those which can direct themselves without any human commands. Even though there are many command controlled robots, there is an increase in demand for the self-controlled robots for the...

 A Novel Approach to FPGA Realization of FIR Filters by Systolization Using Distributed Arithmetic

 Distributed arithmetic (DA) is bit serial in nature and is basically re-arrangement of multiply and accumulate operation. In this project we present the design techniques of 1D and 2D fully pipelined computing st...

STRENGTHENING OF REINFORCED CONCRETE ONE - WAY SLABS USING CFRP IN FLEXURAL

The present study examines the potential of using carbon fiber reinforced polymer (CFRP) strip technique in repairing or strengthenin g of preloaded, cracked, reinforced concrete one - way solid slabs. The reinforce...

IMPLEMENTATION OF ADDRESS GENERATOR FOR WiMAX DEINTERLEAVER ON FPGA

In this paper, a low - complexity and novel technique is proposed to implement the address generation circuitry of 2 - D deinterleaver used in the WiMAX transreceiver using the Xilinx field - programmable gate arra...

 STRATEGY OF FINDING THE MAXIMUM AND MINIMUM VALUES OF THE FUNCTION OF N- VARIABLES WITH AND WITHOUT CONSTRAINT

 This paper is about the finding the maximum and minimum values of the function of n- variables with and without constraint.

Download PDF file
  • EP ID EP111988
  • DOI -
  • Views 70
  • Downloads 0

How To Cite

Rutuja Kulkarni (2015).  IDENTICAL PARALLEL BATCH PROCESSING MACHINES BASED ON ACO MULTI-OBJECTIVE SCHEDULING. International Journal of Engineering Sciences & Research Technology, 4(12), 224-227. https://europub.co.uk/articles/-A-111988