IMPACT OF SAND DREDGING AND SILT EXTRACTION ACTIVITY ON RIVER AND ITS CHARACTERISTICS : A REVIEW
Journal Title: International Journal of Engineering Sciences & Research Technology - Year 30, Vol 5, Issue 3
Abstract
The present research work highlights the influences of sand dredging and extensive silt quarrying activity on rivers. The sand dredging activity and its impact on the river processes and other river environment have discussed in the present review paper. It has seen that most of the rivers and their processes are highly degraded and altered due to these activities. In India and almost in the regions of Maharashtra, the ground water is decreasing and such activities also invited the problems of ground water depletion. The study also deals with the relationship between these activities and river ecosystem.
Authors and Affiliations
Vishal S. Gholap
Humanoid Shadow Robot Using Kinect Technology
The Shadow bot is a basic humanoid with 19 degrees of freedom. At first site, it appears to be just like any other humanoid robot but the real difference comes in when we go inside its working mechanism. Shadow bo...
Different Objective Image Quality Assessment Techniques
Quality assessment plays an improle in image analysis.The study highlight wavelet transformation based technique which is basically a time frequency transformation and compares it with traditional methods like PSN...
Friction Stir Welding Processes: A Review
Friction Stir Welding is a novel green solid state joining process particularly used to join high strength aerospace aluminum alloys which are otherwise difficult to weld by conventional fusion welding. Unlike oth...
A REVIEW ON FUZZY LOGIC BASED HYDROELECTRIC POWER DAM CONTROL SYSTEM
This review paper presents the construction design of Hydro-Electric Power Dam Control System using Fuzzy Logic. This paper is information is helpful for engineering at the time of designing control system for the...
BRANCH AND BOUND TECHNIQUE FOR SINGLE MACHINE SCHEDULING PROBLEM USING TYPE-2 TRAPEZOIDAL FUZZY NUMBERS
This paper deals branch and bound technique to solve single machine scheduling problem involving two processing times along with due date using Type-2 Trapezoidal fuzzy numbers. Our aim is to obtained optimal sequ...