OPTIMIZING THE PERFORMANCE OF THERMAL POWER PLANTS

Abstract

 Failure of boiler tubes has been a familiar phenomenon in power plants resulting in unscheduled plant shut down; in consequence, there are heavy losses in industrial production. The failure of boiler tubes appears in the form of bending, bulging, cracking, wearing or rupture, causing leakage of the tubes. The failure can be caused by one or more modes such as overheating, stress corrosion cracking (SCC), hydrogen embrittlement, creep, flame impingement, sulfide attack, weld attack, ash erosion, dew point corrosion, etc. Failure of tubes in Thermal power plant which is a main contributor to power generation plays a major role in forced outage. In India the Ash percentage in coal is very high i.e 40 –45% which is a major contributor in boiler tube failure in thermal power plants. In this paper, outage optimization is done through minimization of ash erosion by the use of coal

Authors and Affiliations

Sushila Mishra*

Keywords

Related Articles

COMMUTATION TORQUE RIPPL E REDUCTION USING FUZZY LOGIC CONTROLLER IN SENSORLESS BRUSHLESS DC MOTOR

Brushless Direct Current (BLDC) motors are widely used due to high reliability, simple frame, straight forward control, and low friction. BLDC motor has the advantage of high speed adjust ing performance and power den...

 INFORMATION SECURITY AND SECURE SEARCH OVER ENCRYPTED DATA IN CLOUD STORAGE SERVICES

 Cloud computing is most widely used as the next generation architecture of IT enterprises, that provide convenient remote access to data storage and application services. This cloud storage can potentially bring g...

 ANALYSIS OF EARTHQUAKE LOADS ON G+7 STOREYED BUILDING WITH CONCETRIC BRACING SYSTEM AND ECCENTRIC BRACING SYSTEM USING RESIST SOFTWARE

 The proposed project is to analyze the performance of G + 7 multi storied building for lateral forces, (seismic/wind). Work was carried out considering seismic zones (II, III, IV and V) and hard, medium, soft type...

 IMPLEMENTATION OF LOW POWER AND LESS AREA BOOTH MULTIPLIER

 Multiplication in hardware can be implemented in two ways either by using more hardware for achieving fast execution or by using less hardware and end up with slow execution. The area and power of the multiplier is...

 DESIGN AND ANALYSIS OF THREE-PHASE SPLIT SOURCE INVERTER

 In many DC-AC power conversions a voltage source inverter (VSI) along with an additional DC-DC boosting stage is required. To overcome this problem in VSI, a split source inverter is preferred. This paper pres...

Download PDF file
  • EP ID EP112216
  • DOI 10.5281/zenodo.47036
  • Views 54
  • Downloads 0

How To Cite

Sushila Mishra* (30).  OPTIMIZING THE PERFORMANCE OF THERMAL POWER PLANTS. International Journal of Engineering Sciences & Research Technology, 5(3), 273-279. https://europub.co.uk/articles/-A-112216