PERT AND LOB SIMPLIFIED INTEGRATED MODEL FOR DETERMINING PROBABILISTIC SCHEDULING OF REPETITIVE PROJECTS

Abstract

 In a construction project environment there is always a risk or chance that adverse conditions could occur, which may cause the project to fail, or couldn’t meet its planned objectives. The importance of planning and time scheduling has emerged in the last decade and it becomes an essential step for any construction project to reduce this risk. The project schedule should reflect all of the work associated with delivering the project on time. Without a full and complete schedule, the project manager will be unable to communicate the complete effort, in terms of cost and resources, necessary to deliver the project. Most current methods of time schedules and estimating have been converted to software programs in order to be easy to be used by planners and to avoid manual mistakes. Presently, experts in the fields of time planning are searching for better software they can depend on, that is more powerful, easier and serves different kinds of projects. This paper develops software that is essential for improving time planning and estimating for projects that repeat linearly and focuses on features of PERT and LOB for calculating expected completion probability of any repetitive construction project within a specified end date. The software is designed by EXCEL spreadsheet system to provide the factors that affect projects end date probability. At the end, illustrative cases of study are presented to validate and verify the proposed software.

Authors and Affiliations

Sherif M. Hafez*,

Keywords

Related Articles

 ANALYSIS AND COMPARATIVE STUDY OF SEARCHING TECHNIQUES

 We live in the age of technolgy and it is quiet obvious that it is increasing day-by-day endlessly. In this technical era researchers are focusing on the development of the existing technologies. Software engineer...

 NETWORK PERFORMANCE MONITORING USING THRESHOLD CROSSING ALERTS

 Threshold crossing alerts (TCAs) indicate to a management system that a management variable, associated with the state, performance or health of the network, has crossed a certain threshold. The timely detection o...

Performance Evaluation of Cluster Computing

Cluster Computing addresses the latest results in these fields that support High Performance Distributed Computing (HPDC). In HPDC environments, parallel and/or distributed computing techniques are applied to the solut...

 Modifications of Optinet work Software for the Implementation of Advance Genetic Algorithm on Existing Water Distribution Network

 EPANET, a widely used water distribution package was linked to OptiGa, a Visual Basic ActiveX control for implementation of genetic algorithm, through Visual Basic programming technique, to modify the computer so...

 EXTRACTION OF STANDING HUMAN BODIES FROM IMAGES WITH MULTILEVEL SEGMENTATION AND SPLINE REGRESSION

 The ability to extract and detection of human activities by computer vision is very important with many potentialapplications. Extraction of human bodies from images from respective digital image has accomplishedco...

Download PDF file
  • EP ID EP89921
  • DOI -
  • Views 122
  • Downloads 0

How To Cite

Sherif M. Hafez*, (0).  PERT AND LOB SIMPLIFIED INTEGRATED MODEL FOR DETERMINING PROBABILISTIC SCHEDULING OF REPETITIVE PROJECTS. International Journal of Engineering Sciences & Research Technology, 4(9), 109-118. https://europub.co.uk/articles/-A-89921