Success Factors for Build Operate Transfer (BOT) Power Plant Projects in Iran

Journal Title: International Journal of Modern Engineering Research (IJMER) - Year 2013, Vol 3, Issue 1

Abstract

 Abstract: Iranian electric power industry has adopted Build Operate Transfer (BOT) approach in a number of projects as an alternative to utilize private sector investment. Therefore, some power plant projects have been successfully implemented through BOT such as South Isfahan power plant as a first BOT power plant; in contrast, some of them have been failed in the procurement process. Thus, there is a need for improving procurement approaches for future BOT projects. This study identifies and analysis various success factors in BOT power plant projects in Iran. The research methodology that has been utilized including literature review, and survey questionnaire have distributed to BOT experts. Hence, this research establishes success factors for BOT power plant project in Iran comprise of 33 factors. All 33 success factors are consideredas important factors in BOT infrastructure projects; moreover, there is a good agreement in significance of success factors between government organization, consultants, and concessionaires.

Authors and Affiliations

Aminah Binti Yusof

Keywords

Related Articles

Turnstile S-Shaped Dipole and Swastika Wire Antennas for VHF and UHF Applications

New wire antennas are proposed, namely turnstile S -Shaped dipole and Swastika wire antenna. The radiation characteristics are obtained using the method of moments (MoM) with one-volt delta gap source and suitable dimens...

A New 5 Level Inverter for Grid Connected Application

 A five-level inverter is developed and applied for injecting the real power in to the grid to reduce the switching power loss, harmonic distortion, and electromagnetic interference caused by the switching operation...

 Minkowski Distance based Feature Selection Algorithm for Effective Intrusion Detection

 Intrusion Detection System (IDS) plays a major role in the provision of effective security to various types of networks. Moreover, Intrusion Detection System for networks need appropriate rule set for classifyi...

Security in Wireless Sensor Networks Using Broadcasting

Wireless sensor networks as one of the growing technology in the coming decades has posed various unique challenges to researchers. A WSN typically consists of several base stations and thousands of sensor nodes, which a...

 Structural Analysis of NAB Propeller Replaced With Composite Material

 Abstract : The present work deals with modeling and analyzing the propeller blade of a underwater vehicle for their strength. A propeller is a complex geometry which requires high end modeling software. The solid m...

Download PDF file
  • EP ID EP156569
  • DOI -
  • Views 103
  • Downloads 0

How To Cite

Aminah Binti Yusof (2013).  Success Factors for Build Operate Transfer (BOT) Power Plant Projects in Iran. International Journal of Modern Engineering Research (IJMER), 3(1), 324-330. https://europub.co.uk/articles/-A-156569