Time Dependent Quadratic Demand Inventory Models when Delay in Payments is Acceptable

Journal Title: International Journal of Modern Engineering Research (IJMER) - Year 2014, Vol 4, Issue 3

Abstract

 An EOQ model is constructed for deteriorating items with time dependent quadratic demand rate. It is assumed that the deterioration rate is constant and the supplier offers his retailer the credit period to settle the account of the procurement units. To solve the model it is further assumed that shortages are not allowed and the replenishment rate is instantaneous. We have presented the models under two different scenarios, viz., (i)the offered credit period is less than or equal to the cycle time and (ii) the offered credit period by the supplier to the retailer for settling the account is greater than cycle time. The objective is to minimize the retailers total inventory cost. Salvage value is also taken to see its effect on the total cost. A numerical example is given to study the effect of allowable credit period and the total cost of the retailer.

Authors and Affiliations

R. Venkateswarlu1 , M. S. Reddy

Keywords

Related Articles

 Between α-closed Sets and Semi α-closed Sets

 In general topology many strong and weak forms of open and closed sets have been defined and studied. Govindappa Navalagi introduced the concept of semi α-open sets which is a weaker form of α-open sets. Semi*α-ope...

 Classification Rule Discovery Using Ant-Miner Algorithm: An Application Of Network Intrusion Detection

 Enormous studies on intrusion detection have widely applied data mining techniques to finding out the useful knowledge automatically from large amount of databases, while few studies have proposed classification da...

 Damage Tolerance Evaluation for Wing Structure with Large Cutout

 Damage tolerance evaluation of a wing box with large cutout in the bottom skin is carried out in steps. Stress analysis is first carried out to identify the critical location for fatigue crack initiation. A local...

Bolted Joints Analysis Methods and Evaluation

Calculation of accurate bolt forces is the primary requirement in many industries. All the theoretical calculations for bolt forces, includes many significant assumption based on idealized mechanical models. In...

 Lateral Load Analysis of R.C.C. Building

 Abstract: The structure in high seismic areas may be susceptible to the severe damage. Along with gravity load structure has to withstand to lateral load which can develop high stresses. Now a day, shear wall in R....

Download PDF file
  • EP ID EP141896
  • DOI -
  • Views 100
  • Downloads 0

How To Cite

R. Venkateswarlu1, M. S. Reddy (2014).  Time Dependent Quadratic Demand Inventory Models when Delay in Payments is Acceptable. International Journal of Modern Engineering Research (IJMER), 4(3), 60-71. https://europub.co.uk/articles/-A-141896