On a Delayed Differentiation Multi-Product FPR Model with Scrap and A Multi-Delivery Policy – II, using Two-Machine Production Scheme

Abstract

A finite production rate (FPR) system with delayed differentiation, scrap, and multi-delivery policy using a two-machine production scheme was explored by a conventional calculus method [1]. This paper provides an unconventional approach to this specific problem and demonstrates that its solution procedure can

Authors and Affiliations

Yuan-Shyi Peter Chiu, Peng-Cheng Sung, Yung-Ping Liu

Keywords

Related Articles

Optimization of the Process Parameter in Drilling of GFRP using HSS Drill

Fabrication and assembly of parts requires drill holes. The importance of better productivity of the Air craft parts while assembling of polymer composite to avoid the rejection process in drilling operation. The drillin...

Automatic Oil Leak Detection Conveyed Over GSM

Environmental and individual well-being issues have created the need for more efficient leak detection and location on oil pipelines. For organizations working these pipelines a leak, regardless of how unimportant it may...

An Effect on Wear Characteristics of Nano-AL2O3 Particulates Reinforced AL7075 Metal Matrix Composite

Aluminium alloy are playing a major role in synthesizing the body parts of aerospace and automobile sector, because of its ease of production and adoptable to the modification. The hard ceramic particulates addition into...

Tip Leakage Effects on Flow Field of a Centrifugal Compressor

Tip leakage effects on the flow field of a low speed centrifugal compressor is observed computationally using structured multi block grid with fine grid in the tip leakage region. The computational study of centrifugal c...

The Generic Compact Automatic Test Equipment(GCATE) Based on Serial Communication for Fighter Aircrafts

Different Test Equipment (TE) required for the testing of serial communication based avionics systems for different aircrafts are usually supplied by the corresponding manufacturer. So procurement and maintenance of diff...

Download PDF file
  • EP ID EP256300
  • DOI -
  • Views 51
  • Downloads 0

How To Cite

Yuan-Shyi Peter Chiu, Peng-Cheng Sung, Yung-Ping Liu (2017). On a Delayed Differentiation Multi-Product FPR Model with Scrap and A Multi-Delivery Policy – II, using Two-Machine Production Scheme. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ), 7(6), 517-524. https://europub.co.uk/articles/-A-256300