On a Delayed Differentiation Multi-Product FPR Model with Scrap and A Multi-Delivery Policy – II, using Two-Machine Production Scheme

Abstract

A finite production rate (FPR) system with delayed differentiation, scrap, and multi-delivery policy using a two-machine production scheme was explored by a conventional calculus method [1]. This paper provides an unconventional approach to this specific problem and demonstrates that its solution procedure can

Authors and Affiliations

Yuan-Shyi Peter Chiu, Peng-Cheng Sung, Yung-Ping Liu

Keywords

Related Articles

The Effects of TiC Reinforcement on Thermal, Electrical and Dry Sliding Wear Behaviour of Aluminium Matrix Nanocomposites

The present work is to investigate the thermal, electrical & dry sliding wear behaviour of aaluminium matrix composite reinforced with dissimilar particle size (≤ 200 nm and 2 μm) of titanium carbide particles. An alumin...

THE PERFORMANCE ANALYSIS OF MATERIAL HANDLING SYSTEMS FOR A LAYOUT WITH DIFFERENT SPEEDS

Flexible manufacturing systems (FMS) are a group of machines most preferably CNC which is coordinated by a common control centre which has the ability to deal with the variety of products. It is a manufacturing system wh...

An Innovative Design of Air Filter in Diesel Engines of the Tractors

The escape of small particles in the IC engine combustion chamber will cause wear of the cylinders and pistons and that led to reduce the engine performance and its lifetime service. In this study the air filter system w...

A Comparative Study Between the Successive Screw Displacement and Quaternion Based Methods Used in Forward Kinematics of Serial Robot Manipulator

In this article, we compare two forward kinematic formulation procedures for the 6DoF serial robot manipulator. Both formulation procedures are based on the screw theory. Screw theory based methods are alternative to the...

Evaluation of Roughened Duct with Similar Wideness Gap of Arc with Staggered Link and Comparison with Similar Rib Roughness Geometries

This paper introduces new roughness used in roughened duct and evaluates the effective performance for wideness gap of arc with staggered link geometry. The present new roughness geometry has parameters like obstacle pit...

Download PDF file
  • EP ID EP256300
  • DOI -
  • Views 63
  • Downloads 0

How To Cite

Yuan-Shyi Peter Chiu, Peng-Cheng Sung, Yung-Ping Liu (2017). On a Delayed Differentiation Multi-Product FPR Model with Scrap and A Multi-Delivery Policy – II, using Two-Machine Production Scheme. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ), 7(6), 517-524. https://europub.co.uk/articles/-A-256300