On the Timing Analysis of Cluster based Communication Devices for Large Scale Computing Systems
Journal Title: International Journal on Computer Science and Engineering - Year 2012, Vol 4, Issue 10
Abstract
Many parallel computing environments utilize cluster based architecture for large scale computing owing to the ease of their availability. As the cluster based approach may be used extensively, the interconnection mechanism plays a vital role in the performance of the system. The globally coupled class of problem is generally not amenable with the cluster based approach due to its substantial demand for communication across the architecture. In this paper we present a timing analysis of standard cluster based communication devices viz, Ethernet, InfiniBand and the custom designed Floswitch.
Authors and Affiliations
Mohammed Mahfooz Sheikh , A M Khan , U N Sinha
Diagnosis and Medical Prescription of Heart Disease Using Support Vector Machine and Feedforward Backpropagation technique
Expert system are used extensively in many domains. Heart disease diagnosis is a complicated process and requires high level of expertise. This paper describes aiming to develop a expert system for diagnosing of heart d...
Detection of threats in Honeynet using Honeywall
Information is a strategic resource and to protect this kind of confidential and private data against possible attacks, you must take into account some security mechanisms and measures. And as Computer network are subjec...
Effective Term Based Text Clustering Algorithms
Text clustering methods can be used to group large sets of text documents. Most of the text clustering methods do not address the problems of text clustering such as very high dimensionality of the data and understandabi...
An Integer Programming-based Local Search for Large-scale Maximal Covering Problems
Maximal covering problem (MCP) is classified as a linear integer optimization problem which can be effectively solved by integer programming technique. However, as the problem size grows, integer programming requires exc...
Software efforts estimation using Use Case Point approach by increasing Technical Complexity and Experience Factors
An IT industry wants a simple and accurate method of efforts estimation. Estimation of efforts before starting of work is a prediction and prediction always not accurate. Intermediate COCOMO considered 17 factor that aff...