OPTIMIZATION OF MULTI CONTRUCTION PROJECT IMPLEMENTATION WITH LIMITED HUMAN RESOURCE, TIME, AND CAPITAL USING THE RESOURCE LEVELING METHOD
Journal Title: Engineering and Technology Journal - Year 2023, Vol 8, Issue 09
Abstract
The quality and quantity of the number of projects that can be done in units of time into their own selling points for construction service companies in order to continue to compete in the industry. The limitations of human resources, time, and capital are often the problems experienced by companies to meet ever-increasing client demands. This situation needs to be evaluated further. The evaluation of the construction of several construction projects in time can be done by Critical Part Method (CPM) approach to analyze the critical path of a project, Project Evaluation Review Technique (PERT) to know the porsentation of the same project work if done in the future, and Resource Leveling for human resource allocation to avoid recruitment and retraining of workers. Based on research with CPM method, it is found that critical activity is a reference activity that should not be delayed, by using PERT, it can be concluded that some of the allocation and acceleration options of the project can be done based on Z table, and with Resource Leveling, the result of improvement of worker efficiency. This research uses CPM and PERT algorithm to see the allocation of work for multi level and resource leveling as field reference. Effectiveness and efficiency of company performance obtained result of efficiency improvement equal to 24,95% for worker payment and 33,35% for acceleration of project development according to result of research.
Authors and Affiliations
Imama Sodikin , Slamet Hani , Joko Susetyo ,Arif Fadhilah ,
Experimental Study on Light Weight Concrete Bricks by Partial Replacement of Fine Aggregate with Styrofoam
This study investigated into the effect of Styrofoam used as partial replacement for fine aggregate on properties of concrete bricks such as absorption, density and compressive strength. Furthermore, the optimum Styrofo...
Prediction and Verification of Groundwater Potential in Qingyang Area Based on Reliability Test, Validity Test and ROC Curve Method
The combination of remote sensing and GIS has become a common method to locate groundwater potential. Selecting reasonable and effective evaluation factors has become the most important thing in groundwater potential pre...
Optimizing the Citra Raya Conservation Lake as Raw Material for Clean Water Treatment in the Citra Raya Residential Area, Tangerang
In Tangerang, Indonesia, the Citra Raya residential area relies on three Citra Raya Conservation Lakes as sources for clean water production. The area experiences flooding when the lakes overflow during the rainy season....
Long-Term Load Forecasting Incorporating GDP and Population Dynamics
This research paper seeks to create a dependable long-term load forecasting (LTLF) model for Nigeria that includes socio-economic indicators like Gross Domestic Product (GDP) and population trends. Accurate electricity d...
Efficient Use of Water under Irrigation Management Practices for Surface Irrigated Rice
With the continuous climate change we are experiencing; extreme heat, drought, and declining water supplies that affect our rain fed and irrigation systems resulting to a higher demand for water for evaporation and evapo...