OPTIMIZATION OF MULTI CONTRUCTION PROJECT IMPLEMENTATION WITH LIMITED HUMAN RESOURCE, TIME, AND CAPITAL USING THE RESOURCE LEVELING METHOD

Journal Title: Engineering and Technology Journal - Year 2023, Vol 8, Issue 09

Abstract

The quality and quantity of the number of projects that can be done in units of time into their own selling points for construction service companies in order to continue to compete in the industry. The limitations of human resources, time, and capital are often the problems experienced by companies to meet ever-increasing client demands. This situation needs to be evaluated further. The evaluation of the construction of several construction projects in time can be done by Critical Part Method (CPM) approach to analyze the critical path of a project, Project Evaluation Review Technique (PERT) to know the porsentation of the same project work if done in the future, and Resource Leveling for human resource allocation to avoid recruitment and retraining of workers. Based on research with CPM method, it is found that critical activity is a reference activity that should not be delayed, by using PERT, it can be concluded that some of the allocation and acceleration options of the project can be done based on Z table, and with Resource Leveling, the result of improvement of worker efficiency. This research uses CPM and PERT algorithm to see the allocation of work for multi level and resource leveling as field reference. Effectiveness and efficiency of company performance obtained result of efficiency improvement equal to 24,95% for worker payment and 33,35% for acceleration of project development according to result of research.

Authors and Affiliations

Imama Sodikin ,  Slamet Hani  ,   Joko Susetyo  ,Arif Fadhilah ,

Keywords

Related Articles

REDUCTION OF WORK IN PROCESS IN MANUFACTURING SYSTEMS BY MEANS OF A THEORY OF CONSTRAINTS APPROACH AND DISCRETE EVENT SIMULATION

In the manufacturing companies, within their main requirements, it is considered the introduction of strategies and tools to improve the management of resources and production processes, in order to generate higher reven...

Delay Compensation Model in 100mbps Switched Ethernet Using Sliding Mode Controller (SMC)

In the realm of networked systems, achieving timely and reliable communication is paramount, particularly in high-speed environments like 100Mbps Switched Ethernet networks. However, inherent delays in communication chan...

The Temperature-Dependent XAFS Debye-Waller Factor of Molybdenum Metal Calculated using Anharmonic Correlated Einstein Model

Temperature-dependent X-ray absorption fine structure (XAFS) Debye-Waller (DW) factor of molybdenum (Mo) metal has been studied under the influence of thermal disorders. This factor is calculated in simple and explicit f...

EFFECTIVENESS OF FLIPPED CLASSROOM APPROACH TO THE PERFORMANCE OF STUDENTS IN MATHEMATICS 10

This study examined and measured the effectiveness of a flipped classroom method on the performance of Grade 10 learners in mathematics at Liceo de Los Baños. Quantitative research methodology, namely Quasi Experimental...

A DEEP-FRACTURE APPROACH TO EMBEDDED MULTILAYER NEURAL NETWORKS FOR HANDWRITTEN CHARACTER RECOGNITION

Low-cost microcontrollers, but also with reduced processing and memory capabilities, are highly appreciated devices for the development of specific tasks as embedded systems. The devices found in the market today provide...

Download PDF file
  • EP ID EP721084
  • DOI 10.47191/etj/v8i9.09
  • Views 27
  • Downloads 0

How To Cite

Imama Sodikin ,  Slamet Hani  ,    Joko Susetyo , Arif Fadhilah , (2023). OPTIMIZATION OF MULTI CONTRUCTION PROJECT IMPLEMENTATION WITH LIMITED HUMAN RESOURCE, TIME, AND CAPITAL USING THE RESOURCE LEVELING METHOD. Engineering and Technology Journal, 8(09), -. https://europub.co.uk/articles/-A-721084