Optimizing Completions in Deviated and Extended Reach Wells

Journal Title: International Journal of Engineering and Techniques - Year 2015, Vol 1, Issue 2

Abstract

Optimizing completions in deviated and extended reach wells is a key to safe drilling and optimum production, particularly in complex terrain and formations. This work summarizes the systematic methodology and engineering process employed to identify and refine the highly effective completions solution used in ERW completion system and install highly productive and robust hard wares in horizontal and Extended Reach Wells for Oil and Gas. A case study of an offshore project was presented and discussed. The unique completion design, pre-project evaluation and the integrated effort undertaken to firstly, minimize completion and formation damage. Secondly, maximize gravel placement and sand control method .Thirdly, to maximize filter cake removal efficiencies. The importance of completions technologies was identified and a robust tool was developed .More importantly, the ways of deploying these tools to achieve optimal performance in ERW’s completions was done. The application of the whole system will allow existing constraints to be challenged and overcome successfully; these achievements was possible, by applying sound practical engineering principle and continuous optimization, with respect to the rig and environmental limitation space and rig capacity.

Authors and Affiliations

Keywords

Related Articles

Design and Implementation of Data Logger for Vehicle Safety

As the rising of transportation system design, so many data logger design was developed for safety. In our country, there are many accidents on highways. Both driver’s faults and road construction cause accidents. To red...

FEM Analysis of Connecting Rod of different materials using ANSYS

Connecting Rods are practically generally used in all varieties of automobile engines. Acting as an intermediate link between the piston and the crankshaft of an engine. It is responsible for transmission of the up and d...

Kinematic Control of Pick and Place Robot Arm

The robot arm is widely used in many industries and dangerous areas. Automatic control of the robotic manipulator involves study of kinematic. The kinematic problem is defined as the transformation from the Cartesian spa...

Privacy Preserving using PAM in Cloud Computing

The cloud user can remotely access software, services, application whenever they require over the internet. The user can put their data remotely to the cloud storage. So, It is necessary that the cloud must have to ensur...

Survey on Moving Body Detection in Video Surveillance System

This paper represents a survey of various methods of video surveillance system which improves the security. The aim of this paper is to review of various moving object detection technics. This paper focuses on detection...

Download PDF file
  • EP ID EP354560
  • DOI -
  • Views 89
  • Downloads 0

How To Cite

(2015). Optimizing Completions in Deviated and Extended Reach Wells. International Journal of Engineering and Techniques, 1(2), 54-67. https://europub.co.uk/articles/-A-354560