Optimizing Human Resource Allocation in Construction Projects: A Case Study

Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 05

Abstract

In construction, human resources are essential for workers to carry out tasks and work optimally from project initiation to completion. This entails having workers with the requisite skills and abilities for each job description. This research focuses on analyzing the feasibility of constructing the Iskandar Muda Military Regional Finance Office in Banda Aceh City from a human resources perspective. Findings from productivity calculations reveal a decrease in the relationship between duration and work productivity progress, rendering the current number of workers ineffective in ensuring construction feasibility from a human resources standpoint. Despite the presence of 32 workers with skills aligned with job descriptions, the research underscores the importance of optimizing labor allocation and time utilization to enhance productivity. By implementing efficient methods tailored for repetitive tasks and adjusting labor requirements throughout the project duration, this approach proves feasible and effective in achieving better overall results in constructing the Iskandar Muda Military Regional Finance Office.

Authors and Affiliations

Jurisman Amin, Hafnidar A. Rani,Donameir Sianipar,

Keywords

Related Articles

Literature Review of the Green Building Concept of the Minister of PUPR RI Regulation Number 21 of 2021 concerning Evaluation Performance Building Building Green

The green building concept has been adopted as the main approach in the development of this project. The purpose of this final project is to analyze and implement the green building concept based on the Regulation of the...

CFD ANALYSIS OF VARIOUS HEIGHT OF PIN FIN HEAT SINK IN INLINE ARRANGEMENT

The electronic device became the part in a daily life, hence it is our responsibility to increase the life of such electronic devices by providing efficient cooling to the heat producing systems, else it causes permanent...

Long-Term Load Forecasting Incorporating GDP and Population Dynamics

This research paper seeks to create a dependable long-term load forecasting (LTLF) model for Nigeria that includes socio-economic indicators like Gross Domestic Product (GDP) and population trends. Accurate electricity d...

RELIABILITY ANALYSIS OF 20 KV MEDIUM VOLTAGE AIR LINE DISTRIBUTION SYSTEM AT SEMANGGA SWITCH SUBSTATION IN MERAUKE REGENCY

The breakdown of electrical energy can be caused by the unwanted failures that occur in the electric power system, especially in the distribution system, and have an impact on service continuity which can be a permanent...

USE OF CONSTRUCTION INFORMATION MODELLING TECHNOLOGY TO STUDY THE RELATIONSHIP BETWEEN THE SHAPE OF THE PUBLIC HOSPITAL BUILDING AND THE ECONOMIC FEASIBILITY

With the great development that is taking place in the methods of treatment and diagnosis, it had to be accompanied by a similar development in the planning and design of hospitals and management, and with this developme...

Download PDF file
  • EP ID EP735379
  • DOI 10.47191/etj/v9i05.14
  • Views 58
  • Downloads 0

How To Cite

Jurisman Amin, Hafnidar A. Rani, Donameir Sianipar, (2024). Optimizing Human Resource Allocation in Construction Projects: A Case Study. Engineering and Technology Journal, 9(05), -. https://europub.co.uk/articles/-A-735379