PDCA cycle as a part of continuous improvement in the production company - a case study

Journal Title: UNKNOWN - Year 2017, Vol 14, Issue 1

Abstract

The paper presents a case study of the practical use of Deming cycle in a manufacturing company, from the plastics processing industry, from the sector of small and medium-sized enterprises. The paper is a study of literature in the field of continuous improvement and characterized by a cycle of continuous improvement, called the Deming cycle, or PDCA cycle. This cycle was used as a solution to quality problems which occurred during production of photo frames: discolorations and scorches on the surface of the frame. When measures were introduced to reduce the number of nonconformities, a decrease by more than 60% was observed.<br/><br/>

Authors and Affiliations

Marta Jagusiak-Kocik

Keywords

Related Articles

Supervision of measuring equipment based on risk management and ISO 9001

The study presents the results of analysis of the possibilities of measuring equipment supervision, taking into account the requirements of the ISO 9001: 2015 standard and risk management present there. As it has been sh...

Implementation of Six Sigma methodology using DMAIC to achieve processes improvement in railway transport

The provision of quality transport services is a prerequisite for the creation of an efficient organization that can meet the expectations and requirements of both the enterprise itself and its customers. From the railwa...

Comparison of low and high frequency fatigue tests

The paper presents the results of low and high frequency fatigue tests carried out on nodular cast iron. The specimens of synthetic nodular cast irons from three different melts were studied in the high cycle fatigue reg...

LEAN Production issues in the organization of the company - results

The key to the functioning of enterprises in today's market is the concept of flexibility, which is mainly associated with adapting to very dynamically changing customer requirements. The basis for this ap-proach is, amo...

Influence of the environment aggressiveness on durability of girders made of S355 steel in Poland

The following article discusses the problem of durability of girders made of structural steel S355 af-fected by corrosion. It presents the Polish procedure for calculating the time between failures of steel elements of b...

Download PDF file
  • EP ID EP518573
  • DOI 10.30657/pea.2017.14.05
  • Views 52
  • Downloads 0

How To Cite

Marta Jagusiak-Kocik (2017). PDCA cycle as a part of continuous improvement in the production company - a case study. UNKNOWN, 14(1), 19-22. https://europub.co.uk/articles/-A-518573