Peacetime and Wartime Integrated Protection Design Scheme for Piston-action Ventilation Shaft in Metro Station

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 9

Abstract

Objective As the designers' understanding of the wartime protection function and transportation function of the metro stations deviates from the current specification, the estimated indispensable time in the design for the piston-action ventilation shaft to switch from peacetime to wartime is much longer than expected. Therefore, it is necessary to conduct research on the protection design scheme integrating peacetime and wartime functions for the piston-action ventilation shafts in metro stations. Method On the basis of clarifying the position of protection function of the metro station, a wartime operation mode of the metro station is proposed. The contradiction in the peacetime and wartime switching in the design of the existing metro stations is expounded. In view of the difficulties and contradiction in the design of piston-action ventilation shaft in current metro station design integrating wartime protection function, three metro station design schemes integrating wartime protection function are proposed corresponding to three working conditions, i.e. relatively spacious, relatively compact and very compact building space for the air outlets of piston-action ventilation shaft. Result & Conclusion Compared with the conventional design scheme for the station switching from peacetime to wartime by shutting off the piston air duct with sand bags,the above schemes, though costing slightly higher in the early stage of construction, can effectively reduce the workload and significantly shorten the time for the switching between peacetime and wartime, realizing rapid switching of the operation status for metro station between peacetime and wartime .

Authors and Affiliations

Liqiao WU

Keywords

Related Articles

Design of Train Ethernet Consistency Testing Platform Based on IEC 61375 Standard

Objective To ensure the stability, reliability, compatibility, as well as the accuracy of data transmission and control in train network systems, research on the consistency testing of train networks is needed. Method Th...

Research Focus at Different Stages of Urban Rail Transit Prophase Works in the New Era

[Objective] In the future, China′s urban development will shift from construction-orientation to governance-orientation. As an important part of the Chinese-style modern social governance system, urban planning is an imp...

Vehicle-road Cooperative Speed Control System for Trams Passing at Grade Crossings

[Objective] To address the tram issues of needing speed deceleration at grade crossings, a vehicle-road cooperative speed control system for trams passing at grade crossings is proposed. [Method] The operational charact...

Influence of Metro Shield Left/Right Line Tunnel Parallel Under-passing on the Defor-mation and Stress of Existing Open-cut Highway Tunnel under Deformation Joint Working Condition

Objective To ensure the successful implementation of metro shield tunnel parallel under-passing through the existing open-cut highway tunnel project under deformation joint condition, it is necessary to analyze the defor...

Integration Strategy of Ground Auxiliary Buildings in Shenzhen Dayun Comprehensive Transportation Hub Based on Integrated Design Concept

Objective The ground auxiliary buildings in large-scale urban comprehensive transportation hub are numerous and scattered. Some of them are extremely discordant with the surrounding environment due to the restriction of...

Download PDF file
  • EP ID EP744326
  • DOI 10.16037/j.1007-869x.2024.09.018
  • Views 10
  • Downloads 0

How To Cite

Liqiao WU (2024). Peacetime and Wartime Integrated Protection Design Scheme for Piston-action Ventilation Shaft in Metro Station. Urban Mass Transit, 27(9), -. https://europub.co.uk/articles/-A-744326