Planning and Scheduling Construction Projects using Primavera Software A Case Study

Abstract

Planning and Scheduling are very essential in the large infrastructure projects like road and bridge construction. These projects have numerous stakeholders and large amount of money, resources are invested. Improper planning and scheduling leads to loss of resources, increase in project cost and unpleasant delays. But with computer and software evolution, it is now possible to plan these projects using software like Primavera P6 and Microsoft office project. This paper deals with presentation of AwasYojna project in New Market Bhopal comparing the two different blocks namely Block A and Block B. The project framed stated the advantage and added benefits of web based primavera P6 for planning and scheduling of structures under construction under the government scheme of “AwasYojna” framing the issues and complications faced in the time frame of construction and availability of resources. Nidhi Raghuwanshi | Prof. M. C. Paliwal "Planning and Scheduling Construction Projects using Primavera Software: A Case Study" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38447.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38447/planning-and-scheduling-construction-projects-using-primavera-software-a-case-study/nidhi-raghuwanshi

Authors and Affiliations

Nidhi Raghuwanshi | Prof. M. C. Paliwal

Keywords

Related Articles

The Essence of Structural Changes in the Economy of the State

The article contains structural transformations, which are the priority of all stages of reforming the state economy. The article indicates that the priority task of the state is the modernization, technical and technolo...

Working Capital Management and the Financial Performance of Basic Materials Manufacturing Companies in Nigeria

The management of working capital involves managing inventories, accounts receivable and payable, and cash. Based on this assertion, this dissertation is to examine working capital management and the financial performanc...

Group Approach as a Tool for Women Empowerment - A Study

Women in a patriarchal society like India have been suffering since ancient times. The prevailing gender inequality acts as barriers in the path of women empowerment. In rural areas, especially, the condition is at its w...

Green Marketing in India: A Sustainable Prospective

Acknowledging awareness on the numerous environmental related problems has led a shift in the way consumers assume about their life. Changes has been observed in consumer believes for a green lifestyle. People are now da...

A Complete Set of the Chronicle of the Buddha in Myanmar

The aim of study was to find the historical values of Buddhism in Myanmar from the Myanmar Literature. Myanmar Literature is the Pa i Literature origin as a ground. The event of the life of the Gotama Buddha scattered in...

Download PDF file
  • EP ID EP694015
  • DOI -
  • Views 93
  • Downloads 0

How To Cite

Nidhi Raghuwanshi (2021). Planning and Scheduling Construction Projects using Primavera Software A Case Study. International Journal of Trend in Scientific Research and Development, 5(2), -. https://europub.co.uk/articles/-A-694015