Planning Scheme of Shenzhen Airport East Comprehensive Transportation Hub for Air-Rail Intermodal Integration

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10

Abstract

Objective In recent years, China actively promotes the development of air-rail intermodal transportation. However, as a complex system with aviation and high-speed rail two major external transportation modes meeting, the construction and management of air-rail integrated comprehensive transport hub are extremely challenging. In view of the fact that China is still in the initial stage of exploration in this field, it is particularly important to conduct in-depth research on the planning and construction strategy of air-rail intermodal integrated comprehensive transportation hub. Method Taking Shenzhen Airport East Hub as a specific case, focusing on the common problems prevailing in the planning stage, such as the spatial layout optimization of hub facilities and the improvement of traffic organization efficiency, corresponding planning strategies and implementation schemes are proposed. Result & Conclusion The planning of air-rail intermodal integrated comprehensive transportation hub should take the port-city integration, seamless air-rail connection, and convenient-efficient transportation as the core objectives. Specifically, the integrated development of hub and urban space shall be coordinated through the concept of port-city integration; Guided by the integration of air-rail intermodal transportation, the overall spatial layout of the hub shall be scientifically planned; At the same time, relying on the transportation integration strategy, the transportation system within the hub shall be efficiently organized to ensure smooth conversion and efficient operation of various transportation modes.

Authors and Affiliations

Yalong LIU, Guowei TAN

Keywords

Related Articles

Research on Energy Management Method of Fuel Cell Hybrid Power System Based on Improved Equivalent Hydrogen Consumption

Objective Equivalent hydrogen consumption, as a method for optimizing fuel economy, performs poorly in following the state of charge of energy storage systems. Therefore, it is necessary to improve it to achieve dynamic...

Research on Anti-overturning Device of Urban Rail Transit Trains

Objective During the operation of urban rail transit trains, incidents such as collisions, derailments and overturning may occur. It is essential to study the dynamic behavior of trains and the technology to prevent over...

Dynamics Response Simulation Analysis of Underground Space Semi-suspended Lanes under Double-decker Vehicle Loads

Objective The new prestressed hanging wall semi-suspended lane structure in underground complex offers advantages of aesthetic appearance and large clearance. However, the research on the mechanical properties of the new...

Cause Analysis and Control Measures for Inaccurate ATO Parking Accuracy of Qingdao Metro Line 13

Objective In order to solve the stop mark exceeding/failing problem of Qingdao Metro Line 13, it is necessary to deeply analyze the control principle of ATO (automatic train operation) parking and the factors affecting i...

Simulation Analysis of A Metro Station Construction in Shenzhen with Small TBM Advancing Excavation Followed by Large TBM Enlargement

[Objective] The new technique of small-diameter TBM (tunnel boring machine) advancing excavations followed by large-diameter TBM enlargement is used for the first time in the construction of Tumor Hospital Station on She...

Download PDF file
  • EP ID EP749230
  • DOI 10.16037/j.1007-869x.2024.10.027
  • Views 23
  • Downloads 0

How To Cite

Yalong LIU, Guowei TAN (2024). Planning Scheme of Shenzhen Airport East Comprehensive Transportation Hub for Air-Rail Intermodal Integration. Urban Mass Transit, 27(10), -. https://europub.co.uk/articles/-A-749230