Problems Associated with the Implementation of Bioengineering in Hill Road Construction in Nepal

Abstract

The landslide disaster, feeble geology, rapid deforestation, poor drainage system, and increase in mechanical strain have weakened the Krishna Bhir slope, Prithvi Highway, Dhading, Nepal. The objective of this article was to study the problems associated with bioengineering implementation in hill road construction with recommendations. For primary research, a map study, field observation, in-depth interview, focus group discussion, and questionnaire survey were used as an instrument for the field study. Published reports, papers, a thesis, database, manuals, and field observation were also reviewed. The landslide caused loss of property, ill effects on lifestyle, disturbance in the movement of goods and services, loss of availability of water due to damage to the water supply system, damage to the sewage disposal system, etc. During the construction period using the bioengineering technique, the major problem occurred during the installation of the bioengineered system (RII = 0.791), lack of training during construction (RII = 0.839), unavailability of space (RII = 0.817), inadequate supply of appropriate instruments (RII = 0.821) and improper selection of vegetation types (RII=0.839). The major problems were also seen during site monitoring and evaluation (RII= 0.853). Proper selection of plant species (RII=0.936) before implementation of the bioengineering technique is needed at hill roads, but the high installation costs (RII=0.841) could be the major limitation. Bioengineering application has a bright future if proper actions are taken in time. Solutions need to be formulated and implemented by understanding the major limitations of bioengineering techniques.

Authors and Affiliations

Prashant Shah,Khetraj Dahal,

Keywords

Related Articles

Biocontrol of Foot and Root Rot Disease of Groundnut (Arachis hypogaea) by Dual Inoculation with Rhizobium and Arbuscular Mycorrhiza

The present study was carried out to investigate the potential of AM (Arbuscular mycorrhiza) fungi alone and in combination with bioinoculants i.e., Rhizobium to find out the best combination on dry biomass, nodulation,...

Water and Petrol Use Efficiencies of Cabbages and Kales Under Supplemental Irrigation in Kimumu Farm in Uasin Gishu County, Kenya

Cabbages and Kales grown in Kimumu Scheme in Uasin Gishu County were monitored between November, 2017 and February, 2018 for a period of 90 days. Water was pumped from ponds to the vegetables after transplanting. The amo...

Identification of Key Components of Payment For Ecosystem Services (Pes) Mechanism In Begnas Lake Watershed of Pokhara-Lekhnath Metropolitan City, Nepal

Payment for Ecosystem Service (PES) scheme for certain ecosystem services is being used as a mechanism to provide incentive to suppliers of the services by the beneficiaries. In Nepal, PES like schemes is in practice sin...

In Vitro Propagation of Two Tomato Hybrids (Lycopersicon Esculentum Mill.) Via Tissue Culture Technique

This investigation was carried out at the Tissue Culture Lab., Biotechnology Research Center (BTRC) in Tripoli, Libya in 2009 to establish a micro propagation protocol for two hybrids of Tomato in which several factors w...

Morpho-molecular Characterization of Maize Inbred Lines Accelerating Parental Selection for Hybridization

Characterization of genetic diversity is the foundation step for crop improvement, which provides a basis for analyzing combining ability and heterosis of inbred genotypes during a hybridization program. An investigation...

Download PDF file
  • EP ID EP719293
  • DOI https://doi.org/10.54536/ajaset.v7i2.1383
  • Views 103
  • Downloads 0

How To Cite

Prashant Shah, Khetraj Dahal, (2023). Problems Associated with the Implementation of Bioengineering in Hill Road Construction in Nepal. American Journal of Agricultural Science, Engineering, and Technology, 7(2), -. https://europub.co.uk/articles/-A-719293