Productivity Improvement by Applying Work Study in Kitchen of Boy's Hostel Mess

Abstract

This report is an investigation of Boy?s Hostel Mess problem of longer waiting time while having lunch through method study. From the analysis of existing method by Method Study, it is found that there is average waiting of 8 minutes due to Roti Making and Dish Preparation. The solution developed by critical examination of existing method, needs no any additional capital investment but a small change in existing kitchen layout. The proposed modification will result, in zero waiting time due to Roti and only one minute waiting in dish preparation.

Authors and Affiliations

Padsala K. G, Ravalji J. M.

Keywords

Related Articles

A Computational Fluid Dynamics Investigation of Solar Air Heater Duct Provided with Inclined Circular Ribs as Artificial Roughness 

This paper presents a Computational Fluid Dynamics (CFD) analysis of solar air heater duct to estimate its thermo-hydraulic performance. On the inner side of absorber plate, inclined circular ribs are provided to create...

Novelties and Best Practices of On-line Banking Sector by Using Mobile Apps for Potential Customer to Avoid Risk Factors

Online banking (Internet banking) has arises as one of the most profitable e-commerce applications over the last decade. This paper mainly focused the implementation of innovational internet banking and also it focused t...

Development of Aluminum Foams by Different Methods and Evaluation of its Density by Archimedes Principle

Methods for producing metal foams are many, but obtaining repeatability in the properties is very difficult. The main challenge posed by the metal foam is that obtaining homogeneous porosity. Although lot of problems inv...

Design of Storm Water Drainage System to Enhance Ground water Level-A Case Study on Hosur Inner Ring Road (IRR) 

Drainage of water from pavements has been an important consideration in road construction for more than 2000 years. However, modern processing, handling, and placement of materials frequently result in base courses that...

Microwave Drilling with Litz Wire using a Domestic Applicator 

 The work presented in the paper shows a way to drill a blind hole on perspex material at 2.45 GHz frequency of microwaves using a domestic applicator of 700 W maximum powers. The approach was based on the approach...

Download PDF file
  • EP ID EP403589
  • DOI 10.9756/BIJIEMS.10482
  • Views 118
  • Downloads 0

How To Cite

Padsala K. G, Ravalji J. M. (2016). Productivity Improvement by Applying Work Study in Kitchen of Boy's Hostel Mess. Bonfring International Journal of Industrial Engineering and Management Science, 6(4), 166-170. https://europub.co.uk/articles/-A-403589