PRODUCTIVITY IMPROVEMENT IN LIGHT & MEDIUM DUTY CHASSIS ASSEMBLY LINE AT VE COMMERCIAL VEHICLE

Abstract

The research was done in sub-assembly area and the main assembly line in Volvo Eicher Commercial Vehicle plant, plant deals with continuous production & supply of Low, Medium & Heavy commercial vehicles to its customers. Research given the work content & variability reduction of MCV model (11.10 E-WB) in Main assembly line. Present line has very less automation & most of the operations are done manually. That causes the work content & variability are more in each station of Main assembly line. Present line has a problem of line balancing and also the problem of tools & fixtures at various stations. The requirement of the vehicles depends on the demand of the customers. Usually, the marketing peoples convey the requirement of the vehicles to the production planning and control department.

Authors and Affiliations

Sanjotsna Gupta

Keywords

Related Articles

 AN IMPLEMENTATION OF PEARSON CORRELATION METHOD FOR PREDICTING ITEMS TO USER IN E-COMMERCE

 Collaborative filtering algorithms (CFAs) are recommender systems for the collaborating one another to filter documents they read from last decade. CFAs have various features that create them different from other a...

 Hardware Design of A ZIGBEE Smart Energy Implementation for Energy Efficient Building

 This paper gives the brief information regarding the implementation of a smart system for energy efficient building. The hardware design of the proposed system is mainly focused in this paper. The proposed system...

 DETERMINATION OF PHYSICO-CHEMICAL PARAMETERS OF SURFACTANTS IN THE PRESENCE OF UREA AT DIFFERENT TEMPERATURES

 Surface physico-chemical and thermodynamic parameters of some aqueous surfactant solutions were studied using conductance, surface tension and dye spectroscopic techniques. From conductivity and absorbance measurem...

 Secure Modification to Hsiang-SHIH’S Schema: A Case Study

 The proposed schemes of Hsiang and Shih for the remote User authentication scheme using smart card they expropriate their schemes guarded against parallel session attack, and password guessing attacks, I, in this...

 A REVIEW ON CLASSIFICATION OF EEG SIGNAL DATA

 A Brain computing system is a communication channel between the human or animal brain and external environment; it’s a collaboration in which brain controls a mechanical device as a natural part of its representat...

Download PDF file
  • EP ID EP106106
  • DOI -
  • Views 63
  • Downloads 0

How To Cite

Sanjotsna Gupta (0). PRODUCTIVITY IMPROVEMENT IN LIGHT & MEDIUM DUTY CHASSIS ASSEMBLY LINE AT VE COMMERCIAL VEHICLE. International Journal of Engineering Sciences & Research Technology, 4(8), 190-194. https://europub.co.uk/articles/-A-106106