Proposed Improvement of Facility Layout to Optimize Material Handling Costs with ARC, AAD, ARD Approach at PT. Plating Services

Journal Title: Engineering and Technology Journal - Year 2024, Vol 9, Issue 02

Abstract

In the industrial world, the planning and layout of factory facilities is very important in realizing efficiency and smoothness in work. Improper layout can make material transfer time ineffective because the distance between stations is too far. PT. Plating services located in Cikarang have poor layout design and facilities where the distance of material handling from the incoming area to the production area and the temporary finish good area to the shipping area is too far to cause the value of Material Handling Costs (OMH) to be expensive. To reduce the value of OMH in the company, research activities were carried out with the approach of Activity Relationship Chart (ARC), Area Allocation Diagram (AAD) and Activity Relationship Diagram (ARD). The results showed that the long distance of material handling and carried out by 2 workers using hand pallet tools caused the cost of OMH to be expensive at Rp 11,647,584.-/month. Therefore, the researcher made a layout proposal to facilitate the movement of raw materials by adding Karakuri Conveyor facilities in the incoming area to production and quality control area to the shipping area. This can reduce the OMH value by 50.6%. Thus, PT. Plating services can improve the efficiency of the production process and optimize the survival or success of work in the long run.

Authors and Affiliations

Totok Setiyawan, Mulyadi, Yerikho Alexander, Yudi Prastyo,

Keywords

Related Articles

Enhancing Domestic Wastewater Treatment: A Study on the Efficacy of Tiered Filtration and a Combined Photocatalytic Ozonation Methods

This study aimed to construct an optimized reactor using photocatalytic ozonation, and its effectiveness was determined using PermenLHK No. 86/2016. The Tanjung Uma housing estate in Batam city was selected as the study...

Legal Analysis of the use of Foreign Labor in Construction Projects in Indonesia

This research aims to analyze the legal aspects of employing foreign workers in construction projects in Indonesia and to evaluate the effectiveness of the regulations governing the licensing, supervision, and sanctions...

AN EFFICIENT RATE DISTORTION APPROACH FOR VIDEO COMPRESSION

Most rate-distortion optimized quantization methods of video coding involve an exhaustive search process to determine the optimal quantized transform coefficients of a coding block and are computationally more expensive...

The Moderation Effect of Organizational Culture on the Influence of Knowledge Management towards Quality Management in Large-Size Construction Companies

The relationship between knowledge management and quality management is evident in how knowledge management supports the implementation of quality management in the construction process. However, inconsistencies exist re...

Biodiesel Production from Waste Animal Fats: Marketable Products, their Potential, Challenges, and Opportunities

The volatility in global fuel prices and the desire to reduce dependence on fossil fuels necessitate the acceleration of alternative energy sources. The urgent global need to reduce CO2 and greenhouse gas (GHG) emissions...

Download PDF file
  • EP ID EP730607
  • DOI 10.47191/etj/v9i02.10
  • Views 103
  • Downloads 0

How To Cite

Totok Setiyawan, Mulyadi, Yerikho Alexander, Yudi Prastyo, (2024). Proposed Improvement of Facility Layout to Optimize Material Handling Costs with ARC, AAD, ARD Approach at PT. Plating Services. Engineering and Technology Journal, 9(02), -. https://europub.co.uk/articles/-A-730607