Protective Measures for a Tunnel on Xi’an Metro Line 6 Crossing Ground Fissure Zone
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8
Abstract
Objective Xi’an Metro Line 6 Phase Ⅱ project encounters seven ground fissures along one of its tunnels, the poor engineering properties may cause partial tunnel collapse and uneven settlement at the base, exacerbating ground fissure activities and posing serious threats to the construction and operation of urban rail transit. Therefore, it is essential to study protective measures for this Line 6 tunnel crossing ground fissure zones. Method Based on the historical activity characteristics of the ground fissures intersecting Xi’an Metro Line 6 Phase Ⅱ project, a qualitative evaluation of the impact levels of each fissure on metro is conducted. Combining this qualitative evaluation results with the spatial relationship between the tunnel and the fissures, as well as the design value of recommended maximum vertical displacement for the fissures during a 100-year service life, estimates are made for the vertical, horizontal and axial displacements of the fissures and the longitudinal protective length of tunnel structure. According to the engineering prevention principles for Class Ⅱ ground fissure sites, corresponding protective measures are proposed for the tunnel crossing fissure zones. Result & Conclusion The protective measures for a Xi’an Metro Line 6 tunnel crossing ground fissure zones include: adopting segmental seams for tunnel lining structure, increasing tunnel cross-sectional clearance, reinforcing local linings, and using flexible joints at the seams. These protective measures successfully ensure the safe construction and operation of seven metro lines.
Authors and Affiliations
Ziquan HU, Ming SHA, Yinlin HU, Changchun YAO, Jiang RUI
Stratum Deformation Characteristics Analysis of Underground-excavated Metro Tunnel in Construction Waste Backfill Layer
Objective There are more and more cases of metro tunnel engineering crossing through miscellaneous fill strata featured by high porosity, low strength, and easy deformation, resulting in unclear land subsidence mechanism...
In-depth Security Defense Strategy for Rail Transit Vehicle Communication Network System
Objective The vehicle communication network contains a wide variety and a large quantity of internal and external network communication interfaces, resulting in continuous rising of the vehicle information security risks...
Numerical Simulation of Small Unconnected Karst Caves Grouting and Crack Quantity Impact Based on Fluent Software
Objective Grouting treatment of karst caves is a challenge in metro tunnel engineering, as improper handling of karst caves during construction can easily lead to accidents. Therefore, it is necessary to study the relati...
Contactless Traction Power Supply System Design and Efficiency Optimization of Battery Energy Storage Rail Trains
Objective Contactless power supply method, leveraging the advantages of no direct electrical contact between the primary and secondary side coils, is currently being explored in the rail transit industry. The high-power,...
Design of Train Ethernet Consistency Testing Platform Based on IEC 61375 Standard
Objective To ensure the stability, reliability, compatibility, as well as the accuracy of data transmission and control in train network systems, research on the consistency testing of train networks is needed. Method Th...