Abstract

Iran is very rich in oil and gas, which is why the Iran government is investing billions of dollars every year in oil and gas facilities to improve the country. The oil and gas refinery construction industry are very complex and involves multidisciplinary contributors. In this environment, many changes and claims appear. Changes and claims are commonly considered negative events, and thus, should be kept away from the project. With considering this concept, this paper presents the results of a study of the types and causes of project claims in the Persian Gulf Star Gas Condensate Refinery project in Bandar Abbas. The data were analyzed and the consequences of this analysis along with advice on how to reduce/prevent claims in construction are then presented.

Authors and Affiliations

Farshad Shirazi,

Keywords

Related Articles

Using Support Vector Machine For Classification And Feature Extraction Of Spam In Email

We provide an overview of recent and successful content-based e-mail spam filtering algorithms in this article. Our main focus is on spam filters based on machine learning and variants influenced by them. We report on si...

Robust Box Approach for Blood Supply Chain Network Design under Uncertainty: Hybrid Moth-Flame Optimization and Genetic Algorithm

In this paper, a blood supply chain network (BSCN) is designed to reduce the total cost of the supply chain network under demand and transportation costs. The network levels considered for modeling include blood donation...

Approach to Implementing Health and Environmental Safety System in Construction Projects Using Fuzzy Logic

The present study's objective is the implementation of the general Health and Safety Executive(HSE) Plan in civil projects; at first, it is required to formulate the Work Breakdown Structure(WBS) in the relevant project...

Managing portfolio’s risk for improving quality in a project oriented manufacture

Iran is a developing country and there are many different infrastructure projects in hand. Some of the manufacturers that produce equipment for infrastructure projects as for oil, gas and energy projects should manage th...

Investigating the value level of pharmaceutical companies in Tehran Stock Exchange

The main purpose of this research is to examine the relationship between human resources productivity and the value level of companies admitted to the stock market of Tehran Stock Exchange. The methods of library study a...