Providing Business Continuity Plan after Natural Disasters: A Case Study in the Staff Area of Water and Wastewater Company of Tehran

Journal Title: Journal of Disaster and Emergency Research - Year 2019, Vol 2, Issue 2

Abstract

Introduction: Each economic and non-economic institute is inevitably forced to pay special attention to the post-crisis phase to keep its organizational alive, carry out its missions, and reduce the damages and costs caused by various crises. In this research, we tried to extract the Business Continuity Plan (BCP) after the natural disaster of earthquake in the staff area of Water and Wastewater Company of Tehran within the localized framework of BS-25999 British Standards Institution (BSI). Methods: In this regard, a questionnaire was used for data collection. Analysis of the questionnaire results was performed by SPSS19 and Expertchoice11 applications. Results: The manager of Water and Wastewater Company of Tehran was found to be the best authority for managing the emergency so that the company can continue its operation and return to normal situation. According to the findings, the hot site was selected as the best location for business continuity of Water and Wastewater Company of Tehran, which could be an alternative site to continue the activities and services after the disaster. Conclusion: A localized post-earthquake Business Continuity Plan (BCP) was suggested in the staff area of Water and Wastewater Company of Tehran. In this site, necessary actions can be perfromed to continue the activities before, during, and after the disaster. Furthermore, organizational chart and task description can be redefined in it.

Authors and Affiliations

Vahid Shafaie, Farid Darvish, Mehrdad Nazariha, Saeed Givehchi

Keywords

Related Articles

Analyzing the Performance of Red Crescent Society of Khorasan Razavi Province in Kermanshah Earthquake

Introduction: Kermanshah earthquake with magnitude of 7.3 is one of the largest earthquakes in recent decades in Iran. The incident led to discover the existing gaps in the crisis management system in the country. Studyi...

A Survey on the Prevalence of Choking in Children under Two Years Old and Awareness of Mothers Referring to Health Centers in Ahvaz City

Introduction: Accidents are one of the most important health problems that always threaten children, and inability caused by them not only affects their health but also their education and other dimensions of their life...

Hospital Safety Index in Hospitals Affiliated with Alborz University of Medical Sciences in 2015

Introduction: To survive is the first concern of people after disasters. The ability to keep performing and offering services in hospitals at the same time as appropriate responding to the medical needs of disaster victi...

The Effect of Integrated Management System on Risk Priority Number of Environmental Assessment by FMEA Method in Yazd PersepolisTile Factory

Introduction: Considering the increasing trend of implementing integrated management system (IMS) in different industries to improve safety and health standards, environment and quality, this study aimed to evaluate the...

Download PDF file
  • EP ID EP658476
  • DOI 10.18502/jder.v2i2.1515
  • Views 96
  • Downloads 0

How To Cite

Vahid Shafaie, Farid Darvish, Mehrdad Nazariha, Saeed Givehchi (2019). Providing Business Continuity Plan after Natural Disasters: A Case Study in the Staff Area of Water and Wastewater Company of Tehran. Journal of Disaster and Emergency Research, 2(2), 91-109. https://europub.co.uk/articles/-A-658476