Public Project Delay Monitoring by Implementation Coordination Unit

Abstract

Malaysian government places high priority on the construction industry by allocating 60 percent from the total allocation for physical development of public project delivery. However, 113 on-going project are delayed and facing shortfalls in spending expenditure. Thus, it is important that these delay and over-budget problems being tackled by the Implementation Coordination Unit (ICU), who coordinates and monitors the implementation of the public projects. Hence, this paper is undertaken with the aim of evaluating the effectiveness in monitoring delayed pubic projects by ICU. This aim is achieved via objectives of identifying the causes of public project delay based on the monitoring by ICU, examining the monitoring tools currently used by ICU in monitoring public project delay, and proposing improvement measures for effective monitoring of the public project delay by ICU. Data was collected via document review, which is subsequently validated via questionnaire survey on the purposive sample of 16 monitoring officers at ICU and analysed via Microsoft Excel. It is found that the main causes of delayed public projects are contributed by contractor-related followed by project implementation-related, utility-related, land and site-related problems. Project monitoring systems currently used by ICU are Project Monitoring System II (PMS II) and Integrated Project and Tracking Analysis Updates (iPANTAU), which are claimed by the respondents as effective to identify and solve the problem of public project delay. The top proposed improvement measure for PMS II and iPANTAU are developing contractor score rating system based on their performance in PMS II and improve competency of monitoring officers, particularly on identifying the causes of delay before keying in the data into iPANTAU, respectively. This paper is expected to enhance the efficiency of these systems by providing accurate information needed to the stakeholders.

Authors and Affiliations

Nor Hidayati Abdul Aziz, Syuhaida Ismail

Keywords

Related Articles

Russia-Super Power in the Black Sea: from Strategic and Economic Aspects

The Black Sea region occupies an important place in history, because of its geographical, historical, geopolitical, geostrategic, geoeconomic and geo-ethnic location. Great Powers have been and continue to be of interest...

Quantification of Critical Success Factors of Contractors in Cambodia: AHP Approach

Project success is commonly defined as a completion of a construction project within stipulated time, estimated cost and required quality. Undoubtedly, contractor’s, who is one of the influencing stakeholders for project...

A Conceptual Framework to Explain Transition of Intercultural Communication Conflict, Social Environment and Personality

This study conceptually examines a comprehensive framework that integrates intercultural communication competence (ICC) as a key perspective to better understand intercultural communication conflict in multicultural soci...

Optimal Control of the Macroeconomy with the Application to 2001 crisis of Turkey

This paper concentrates on the application of optimal control theory to highlight some aspects of Turkish economy. First the setup is given for Turkey to grow over the balanced path. Then the optimal control problem is i...

Assessing the Optimal Capital Structure: A Case Study of Afren Public Limited Company - A Small Exploration and Production Oil and Gas Company

This study assessed the optimal financing mix for Afren Public Limited Company based on the trade-off theory and evaluated the cost to the firm from deviating from that position. In doing this, we derived a firm-specific...

Download PDF file
  • EP ID EP377979
  • DOI 10.31039/jomeino.2017.1.2.2
  • Views 75
  • Downloads 0

How To Cite

Nor Hidayati Abdul Aziz, Syuhaida Ismail (2017). Public Project Delay Monitoring by Implementation Coordination Unit. Journal of Management, Economics, and Industrial Organization, 1(2), 17-23. https://europub.co.uk/articles/-A-377979