Reactive Power Compensation Scheme for Urban Rail Power Supply System Considering Main Substation Resource Sharing
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 2
Abstract
[Objective] The resource sharing among main substations in urban rail transit power supply system can lead to significant cost savings. In this context, it is essential to investigate reactive power compensation schemes for different phases of main substation resource sharing to ensure that the power factor at the PCC (point of common coupling) meets the standards. [Method] Taking the power supply system of a city's metro line as example, based on the train schedule and power supply system structure, the minimum reactive power compensation required at PCC before and after main substation resource sharing under daily power factor compliance is calculated. A reactive power compensation setting scheme considering main substation resource sharing is proposed, based on the minimum reactive power compensation that meets the compensation requirements before and after main substation resource sharing, with the goal to minimize SVG (static var generators) capacity, determining the installation capacity of SVG and reactor or capacitator. [Result & Conclusion] In the power supply system of the case study line, the actual configuration of the reactive power compensation devices for the 1# main substation main transformer power supply zone is as follows: reactor capacity is 6.0 Mvar, and SVG capacity is 1.0 Mvar. For the 2# main transformer power supply zone, the configuration is a reactor capacity of 3.0 Mvar and an SVG capacity of 0.5 Mvar. The proposed reactive power compensation scheme replaces a total capacity of 9.0 Mvar SVG devices with reactors, meeting the reactive power compensation requirements while reducing investment costs.
Authors and Affiliations
Liying LI, Dan ZHOU, Shan LIN, Dayun ZOU, Haiqi JIN, Kai XIE, He QI, Jian ZHANG
Sensitivity Analysis of Design Parameters for Suspended Monorail Single-ribbed Arch Bridge
[Objective] As there are few case studies on suspended monorail single-ribbed arch bridge, it is necessary to analyze the sensitivity of different design parameters to better instruct the design and construction of the b...
Key Functions of Automated Depot under TACS System
Objective Under TACS (train autonomous control system), the key functions of automated depot significantly impact train operational efficiency. It is essential to study these critical functions in automated depot by focu...
Comparative Analysis of Balanced Maintenance System and Scheduled Maintenance System for Urban Rail Transit Vehicle
[Objective] In order to reduce the purchase cost and operation and maintenance cost of urban rail transit vehicles as much as possible, balanced maintenance system is adopted in some cities in China. Therefore, it is nec...
Post-evaluation and Analysis of Passenger Flow on New Rail Transit Lines
[Objective] In the construction and operation of urban rail transit, improving the passenger flow forecasting accuracy for new lines has gradually become a key focus in the rail transit industry. Therefore, it is necessa...
Design Scheme of Application Library Tracks for City (Suburban) Railway Vehicle Bases
[Objective] To enhance the overall efficiency of vehicle base engineering, reduce investment costs, and strengthen the technical reserves and adaptability of process design, research is carried out on the design schemes...