Reclamation Suitability Evaluation of Damaged Mined Land Based on the Limit Condition Method-Example of Pingdingshan Tianan Ten Coal Mine

Journal Title: Engineering and Technology Journal - Year 2021, Vol 6, Issue 9

Abstract

Reclamation suitability evaluation is the basis for determining the reuse direction of damaged land. Limit condition method is the most widely used method in land reclamation suitability evaluation at present. In this paper, the limit condition method is used to evaluate the suitability of land reclamation of damaged land in Pingdingshan Tianan ten coal mine. The evaluation index of damaged area is determined as six main factors: field slope/land flatness, ponding, depth of collapse, soil texture, thickness of soil layer, irrigation and drainage conditions, and finally determine the reclamation direction of the land to be reclaimed in combination with the overall local land use planning and the overall wishes of local residents.

Authors and Affiliations

 Wu Ya-lin  ,  Feng You-li  ,  Wang Qi-sen  ,  Gao Chong  ,  Zhang Zhuo

Keywords

Related Articles

Research on Human Pose Estimation Model Based on Long-Range Fine-Grained Modeling

To address the issues of lacking long-range spatial position learning ability and excessive loss of fine-grained feature information during spatial feature pooling in human pose estimation models, a novel human pose esti...

TOXICITY TEST OF WASTE OIL BEFORE AND AFTER TREATMENT USING PHYTOREMEDIATION ON BIOINDICATORS

Silugonggo River is a river that crosses Juwana District, Pati Regency, Central Java, which empties into the Java Sea. Industrial activities and workshops around the Silugonggo River cause river water to become polluted...

Supply Chain Analysis and Distribution of Cut Flowers at PT. Bromelia Indah

The aim of this research is to obtain a broad picture of the cut flower supply chain, cut flower distribution channels that currently exist in the Company. The method used is descriptive analysis using the horticultural...

Quality Control for The Maintenance Organization in Clark Pampanga for Line Maintenance

Unscheduled maintenance happens where an unknown problem occurs that is not in the schedule of tasks to be performed by a mechanic unlike scheduled maintenance, line maintenance is done every landing and before take-off...

Energy Consumption Management in IoT by Load Balancing at Near-Root Nodes in RPL Protocol

Managing energy consumption in Internet of Things constitutes a challenge for researchers. Many existing works address this question. Some approaches propose solutions based on artificial intelligence. Other studies are...

Download PDF file
  • EP ID EP698222
  • DOI 10.47191/etj/v6i9.03
  • Views 103
  • Downloads 0

How To Cite

 Wu Ya-lin ,  Feng You-li ,  Wang Qi-sen ,  Gao Chong ,  Zhang Zhuo (2021). Reclamation Suitability Evaluation of Damaged Mined Land Based on the Limit Condition Method-Example of Pingdingshan Tianan Ten Coal Mine. Engineering and Technology Journal, 6(9), -. https://europub.co.uk/articles/-A-698222