RECONSTRUCTION OF WAR DAMAGED BUILDINGS - A PROBLEM THAT STILL STANDS. THE CASE OF THE NATIONAL ECONOMY BANK IN WARSAW RESTORED DURING THE SECOND WORLD WAR

Journal Title: Civil and Environmental Engineering Reports - Year 2016, Vol 4, Issue 23

Abstract

The Polish national historiography remains silent on the reconstruction of damaged towns and cities that was undertaken by the German administration after capturing Poland in September 1939. This paper, on the war-time restoration of the National Economy Bank’s headquarters in Warsaw, is an attempt to at least partially fill the gap. Designed by celebrated architect Rudolf Świerczyński in the late 1920s in accordance with contemporary air raid defence regulations, it was bombed and nevertheless seriously damaged during the September Campaign. Under the German management of the bank, the building was reconstructed and even modernized by commissioned Polish engineers.

Authors and Affiliations

Sławomir ŁOTYSZ

Keywords

Related Articles

HISTORIC BUILDINGS OF THE WARSAW UNIVERSITY OF TECHNOLOGY - SELECTED ISSUES OF RENOVATION, MODERNISATION AND ADAPTATION

The historic buildings of the Warsaw University of Technology display not only outstanding architectural values, but are also representative of the trends in preservation, restoration, and adaptation that were prevalent...

ASPERGILLI ON BUILDING PARTITIONS INFESTED WITH MOULDS IN RESIDENTIAL HOUSING AND PUBLIC UTILITY PREMISES

Aspergilli constitute a serious risk to the health of the inhabitants of infested rooms. Mycological analysis conducted in buildings infected with moulds in the area of the Lubuskie province (Poland) demonstrated the pre...

THE IMPACT OF VARIED FERTILISATION ON THE CONCENTRATION OF CADMIUM AND COPPER IN ORGANS OF WILLOW TREES (SALIX VIMINALIS)

The paper presents the impact of varied fertilisation with sewage sludge on the concentration of cadmium and copper in willow organs during the first three years of cultivation. The lowest mean concentration of cadmium i...

Activity of soil enzymes in rhizosphere of scots pine as a marker of the quality of wooded, formerly arable, soils

The purpose of this paper is the assessment of the influence of rhizosphere on the enzymatic activity of formerly arable soils afforested with Scots Pine (Pinus sylvestris L.). A comparison was made between the enzyme ac...

TESTS OF A REINFORCED CONCRETE FRAME BEAM SUBJECTED TO SEISMIC-TYPE LOADING

The experimental results from reversed cyclic loading tests on twelve exterior reinforced concrete beam-column joints are presented. The primary variables were the ratio of positive to negative reinforcement and the stir...

Download PDF file
  • EP ID EP243244
  • DOI -
  • Views 28
  • Downloads 0

How To Cite

Sławomir ŁOTYSZ (2016). RECONSTRUCTION OF WAR DAMAGED BUILDINGS - A PROBLEM THAT STILL STANDS. THE CASE OF THE NATIONAL ECONOMY BANK IN WARSAW RESTORED DURING THE SECOND WORLD WAR. Civil and Environmental Engineering Reports, 4(23), 111-124. https://europub.co.uk/articles/-A-243244