Relevance and Applicability of Multi-objective Resource Constrained Project Scheduling Problem: Review Article

Journal Title: Engineering, Technology & Applied Science Research - Year 2011, Vol 1, Issue 6

Abstract

Resource-Constrained Project Scheduling Problem (RCPSP) is a Non Polynomial (NP) - Hard optimization problem that considers how to assign activities to available resources in order to meet predefined objectives. The problem is usually characterized by precedence relationship between activities with limited capacity of renewable resources. In an environment where resources are limited, projects still have to be finished on time, within the approved budget and in accordance with the preset specifications. Inherently, these tend to make RCPSP, a multi-objective problem. However, it has been treated as a single objective problem with project makespan often recognized as the most relevant objective. As a result of not understanding the multi-objective dimension of some projects, where these objectives need to be simultaneously considered, distraction and conflict of interest have ultimately lead to abandoned or totally failed projects. The aim of this article is to holistically review the relevance and applicability of multi-objective performance dimension of RCPSP in an environment where optimal use of limited resources is important.

Authors and Affiliations

B. O. Odedairo, V. Oladokun

Keywords

Related Articles

Effect of Transformational Leadership on the Creativity of Employees: An Empirical Investigation

Considering the accelerated pace of developments and advancements in the current era, organizations which have innovative, change-oriented managers and leaders with a long-term vision are more likely to survive the compe...

Application of Fuzzy Expert Systems to Manage the Projects Time in Iranian Gas Refineries

The National Iranian Gas Company (NIGC) is one of the top ten gas companies in the gas industry in the Middle East and is comprised of 7 gas refineries. So this company needs to apply the most optimum time management met...

Fabrication and Characterization of Organoclay Reinforced Polyester Based Hybrid Nanocomposite Materials

Synthesis and characterization of polyester nanocomposites was conducted in order to fabricate hybrid composite materials of polyester/montmorillonite (MMT). Polyester based polymeric nanocomposite materials were synthes...

Leakage Reduction in Water Distribution Systems with Efficient Placement and Control of Pressure Reducing Valves Using Soft Computing Techniques

Reduction of leakages in a water distribution system (WDS) is one of the major concerns of water industries. Leakages depend on pressure, hence installing pressure reducing valves (PRVs) in the water network is a success...

A Survey on the Criteria for Measuring the Profitability of a Construction Organization

Any organization’s performance depends on profitability which depends on several adopted criteria. The preference and level of adoption of these criteria varies, on different industries. This study focuses on investigati...

Download PDF file
  • EP ID EP84806
  • DOI -
  • Views 323
  • Downloads 0

How To Cite

B. O. Odedairo, V. Oladokun (2011). Relevance and Applicability of Multi-objective Resource Constrained Project Scheduling Problem: Review Article. Engineering, Technology & Applied Science Research, 1(6), -. https://europub.co.uk/articles/-A-84806