Abstract

This study investigate the reliability assessment of Apo 132/33kV Transmission substation, AbujaNigeriato provide adequate electrical supply to its customers as economically as possible with reasonable level of reliability. The system reliability impact data on statistical information were classified as unscheduled (forced) and scheduled(planned)maintenance outages on each feeder were collected from January to December, 2015 as documented in the daily logbooks. The data wereused to compute and analyzed the reliability indices using Microsoft and Excel package with respect to customer orientation indices of SAIFI, SAIDI, CAIDI, and ASAI using equations 1 to 4. The results shows thatunscheduled (forced) outages reliability indices for H3, H13 and H15 feeders for average service availability index (ASAI) were 0.9935, 0.9935, and 0.996; while consumer average interruption duration index (CAIDI) were 3.48, 3.7, and 2.368 respectively. The maximum CAIDI was recorded on feeder H13 in the month of October with interruption duration of 3 hours and 42 minutes. The maximum system average interruption duration index (SAIDI),recorded 17.193, 13.49, and 9.875 with the highest in June on feeder H3 and 13 hours 33 minutes. Also the maximum system average interruption frequency index (SAIFI), for the corresponding feeder’s were7.6, 6.0, and 5.7 respectively. The results of planned outages system reliability for the same feeders were also analyzed and presented.

Authors and Affiliations

Aibangbee, J. O. 1 ,, Ckukwuemeka, I. N. 2

Keywords

Related Articles

Reduced Levelized Cost ofEnergythrough Optimization of Tower Height, Rotor Diameter And\Wind Farm Layout

Wind power has become the most important renewable energy source. Two factors are mainly influencing its future development: scarcity of sites and levelized cost of energy (LCoE). By a site specific turbine and wind park...

Fault Detection and Isolation (FDI): Efficient Technique and Analysis

This paper deals extensively on Fault Detection and Isolation (FDI) techniques, using a three tank system with two inputs, three measured outputs and three States. And describes how the Fault detection and Isolation was...

A Survey Paper on Real Time Detection & Reporting By Social Networks

In today’s era social network like Twitter, Facebook, LinkedIn playing very vital role in human behavior & their day to day life. These social networking sites can be used as social sensors such that we can predict or re...

Prospects of TVET for Ghana’s Industrial Development

In Ghana the dissemination and use of Technical and Vocational knowledge in industry have a great importance for both national and international competitiveness. In the developed countries, improving the job skills of th...

Overview of the Nigerian Power Sector

: The power sector in Nigeria through the years have been a tortuous, difficult, painful, devastating and herculean task for both the governments and the populace. A population of about 170 million people with more than...