Representing IT Projects Risk Management Best Practices as a Metamodel

Journal Title: Engineering, Technology & Applied Science Research - Year 2017, Vol 7, Issue 5

Abstract

Although still relatively new, the field of IT Governance has its own bodies of knowledge that include various methodologies, frameworks and techniques supported by an increasing growing base of research. IT Project Risk Management has since emerged as its own field. Many frameworks and methodologies were proposed by both practitioners and researchers. A review of the literature about the subject shows that there is a divergence between the two. The practitioners propose a set of good practices from professional environment but the heaviness of the proposed guides does not allow its application and adoption by managers or it’s improvement by researchers. Thus it calls for specific focus on IT governance frameworks best practices modelling in order to reach fusion between practitioners and researchers contributions. In this paper, special attention is dedicated to Project Management Institute’s guides. The main objective is representing IT Project Risk Management best practices as a Metamodel in order to complement different areas of knowledge.

Authors and Affiliations

A. El Yamami, S. Ahriz, K. Mansouri, M. Qbadou, E. Illoussamen

Keywords

Related Articles

A Study of the Formation of Velocity Counter Lines and Secondary (Spiral) Flows in Different Cross Sections of Divergent, Convergent and Uniform Arcs

The mechanical properties of flow are very complex in channel arcs. Therefore, dynamic numerical models of fluids are considered effective tools in predicting such flow fields. In this study, the numerical model was vali...

A 4-4.8GHz Adaptive Bandwidth, Adaptive Jitter Phase Locked Loop

A low power, low phase noise adaptive bandwidth phase locked loop is presented in this paper. The proposed structure benefits from a novel lock status monitor unit (LSMU) that determines loop operation and loop bandwidth...

Realization of a Single-Phase Multilevel Inverter for Grid-Connected Photovoltaic System

This paper introduces the implementation of a single-phase multilevel inverter for a grid-connected photovoltaic system. The considered topology contains a full bridge converter tied to an auxiliary circuit made of two p...

A Novel Three Phase to Seven Phase Conversion Technique Using Transformer Winding Connections

This paper proposes a novel multiphase transformer connection scheme which converts three phase balanced AC input to seven phase balanced AC output. Generalized theory to convert a three phase utility supply into any num...

State-Space Modeling and Performance Analysis of Variable-Speed Wind Turbine Based on a Model Predictive Control Approach

Advancements in wind energy technologies have led wind turbines from fixed speed to variable speed operation. This paper introduces an innovative version of a variable-speed wind turbine based on a model predictive contr...

Download PDF file
  • EP ID EP154754
  • DOI -
  • Views 235
  • Downloads 0

How To Cite

A. El Yamami, S. Ahriz, K. Mansouri, M. Qbadou, E. Illoussamen (2017). Representing IT Projects Risk Management Best Practices as a Metamodel. Engineering, Technology & Applied Science Research, 7(5), -. https://europub.co.uk/articles/-A-154754