RESEARCH ON RISK ASSESSMENT OF THE PPP RAIL TRANSIT PROJECTS BASED ON IMPROVED CUOWGA – SHAPLEY VALUE

Abstract

The PPP rail transit projects develop rapidly in China, due to its many participants, long construction period, large scale and other characteristics, causing lots of risks in the construction process. It need to evaluate its risk to identify key risks. Considering the features of PPP and rail transit projects, the three level index system of risk assessment in the whole life cycle of the PPP rail transit projects are established, which combines the characteristics of PPP project. The fuzzy semantic quantization operator and the normalized decision matrix are used in the CUOWGA operator to improve it. The improved CUOWGA operator and Shapley function are combined to evaluate the index system of risks. This model not only eliminates the subjective assumptions of decision data in the operation process, but also considers the correlation in different risks, and makes the evaluation result more accurate. Finally, the science and effectiveness of the combined model is verified by a case.

Authors and Affiliations

XUN Zhi-yuan, WU Qiu-lin, LI Yao

Keywords

Related Articles

APPLICATION OF COMPUTER AIDED DESIGN IN PROCESS DESIGN OF ACID MAKING BY FLUE GAS

In order to liberate designers from complicated and repetitive calculation work, the design cost of sulphuric acid process is reduced. According to the production process of acid making by flue gas and the operation char...

NUMERICAL SIMULATION ANALYSIS ABOUT THE EXPLOSION PROPAGATION PROCESS OF PIPELINE GAS ON THE EFFECT OF COMPLEX OBSTACLES

Natural gas explosion seriously endanger social stability and public life property safety, study the pipeline gas explosion is high importance of the safety enterprise production and social stability. Through the theoret...

ENGINEERING EXAMPLE OF DYNAMIC COMPACTION REPLACEMENT FOR MISCELLANEOUS FILL FOUNDATION AND ANALYSIS OF TREATMENT EFFECT

There is a layer of miscellaneous fill on the surface at a certain site in Huangshan City which has low strength, high compressibility and poor engineering properties. The dynamic replacement was used to increase its str...

PREPARATION OF SIO2 MODIFIED CHITOSAN AND PROPERTIES IN TREATING DYE WASTEWATER

SiO2 modified chitosan was prepared by modifying chitosan with trimethoxysilane treated SiO2, and the effects of different factors, like dye solution pH value, adsorption time, dye original concentration and temperature...

MEASUREMENT OF MOLTEN POOL TEMPERATURE FIELD IN TWIN-ROLL CASTING OF THIN STRIP STEEL

To measure the temperature distribution of molten pool in twin-roll strip casting, a new method based on the soft measurement of temperature field and on-line measurement of fixed point temperature was presented. A three...

Download PDF file
  • EP ID EP411096
  • DOI 10.26480/iceti.01.2017.151.154
  • Views 68
  • Downloads 0

How To Cite

XUN Zhi-yuan, WU Qiu-lin, LI Yao (2017). RESEARCH ON RISK ASSESSMENT OF THE PPP RAIL TRANSIT PROJECTS BASED ON IMPROVED CUOWGA – SHAPLEY VALUE. Topics in Civil, Environmental & Building Engineering (TICEBE), 1(2), 151-154. https://europub.co.uk/articles/-A-411096