Research on the Integrated Detection Host System of Urban Rail Transit Trains
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 1
Abstract
[Objective] In order to ensure the safe operation of urban rail transit, meet the detection requirements of track obstacles and key components such as pantograph-catenary, running gear and track, and solve problems of the detection subsystems independent of each other and the vehicle integration redundancy, it is necessary to conduct research on the integrated detection host system of trains. [Method] The subsystems of the active obstacle detection, pantograph-catenary detection, running gear detection, and track geometry dynamic detection are designed in an integrated way, and an integrated detection host system is proposed. Specifically, the active obstacle detection subsystem is directly connected to the AI (artificial intelligence) board of the integrated host through a switch, and each of other subsystems is first connected to a front-end host for data preprocessing, and then connected to the AI board of the integrated host through a switch. [Result & Conclusion] The proposed system can monitor the real-time running status and operating environment of the train, promptly detect potential safety hazards and issue early warnings, thus providing guarantees for the safe operation of urban rail transit. Compared with other existing independent detection subsystems, the proposed one breaks down the barriers between detection subsystems and simplifies the vehicle integration. It can alleviate the on-board equipment redundancy, save the overall power consumption of the train, reduce system costs, ultimately improving system compatibility and extensibility, as well as the efficiency of system configuration, maintenance and monitoring.
Authors and Affiliations
Zhi CHEN, Hongqiang LYU
Research and Analysis of Medium-low Speed Maglev Train Noise
[Objective] In the actual operation process, the noise generated by medium-low speed maglev trains is a key factor affecting the quality of train service. Therefore, it is necessary to analyze the noise in medium-low spe...
Analysis of Railway Hub Function and Passenger Flow Demand under the Integrated Station-City-People Development
[Objective] Under the integrated station-city-people development, the railway passenger transport hub is upgraded to a new type of urban space that provides emotional connection and sustenance while undertaking transpo...
PBA Construction Technology for Metro Station Expanding Excavation Undercrossing Parallel Existing Structure
Objective Affected by the occupation of existing buildings (structures) on the ground, the main retaining piles in shield receiving areas at both ends of some metro stations cannot be built. Therefore, it is necessary to...
Fault Analysis and Resolution Measures for Overvoltage Chopping IGBT of Chongqing Rail Transit Line 2 Trains
[Objective] Multiple incidents of overvoltage chopping IGBT (insulated gate bipolar transistor) faults are observed during train main line operation of Chongqing Rail Transit Line 2, significantly impacting the line norm...
Analysis and Countermeasures for EMU Traction Motor Stator Insulation Faults
[Objective] To ensure the reliability of the stator insulation in EMU (electric multiple unit) traction motors during stator manufacturing or maintenance, it is necessary to conduct tests such as ground insulation withst...