Abstract
Objective As the development and utilization of urban underground space advances towards the three-dimensional and multi-dimensional direction, there are more and more over-crossing and under-crossing urban rail transit projects. Among them, the close under-crossing construction of new stations with large cross-section has a significant impact on the surrounding environment. Therefore, it is urgent to carry out an in-depth study on the ground settlement and deformation law of existing stations during the new station construction process closely under-crossing existing stations by Pile-Beam-Arch (PBA) method. Method Based on the actual engineering case of Beijing Metro Line 6 Pinguoyuan Station, which closely under-crosses the existing station with same name on Metro Line 1, the law of ground settlement and deformation of the existing station is analyzed by adopting numerical simulation method in the study. By comparing the actual monitoring data, the actual situation of ground settlement and deformation of the existing station during the construction process is further verified, and the numerical simulation results are compared and analyzed with the measured data. Result & Conclusion The most unfavorable stages for ground settlement and existing structure deformation are the guide hole excavation stage and the second lining arch stage of PBA method. After the completion of second lining arch construction, both the ground settlement and the deformation of the existing structure show rebound phenomenon. In addition, the stiffness of the existing station has a significant inhibiting effect on the ground settlement above, which is manifested in the fact that the ground settlement value of the overlapping section is smaller than that of the non-overlapping section. The deformation of the existing station structure caused by new station constructed with PBA method is mainly the rigid body displacement, while it caused track structure deformation is mainly the overturning deformation, which is locally manifested as rigid body displacement.
Authors and Affiliations
Mingyang XU, Haitao WANG, Jiangtao TIAN, Zhiwei ZHANG, Qiang YOU
Energy Consumption Analysis and Verification of Permanent Magnet Direct Drive Metro Trains
Objective The permanent magnet direct drive technology for metro trains, as a novel traction solution, offers certain advantages in energy saving and noise reduction. Thus, it is aimed to specifically investigate its ene...
Regional Rail Transit Electronic Map Data Management Scheme for Intercity Railway Through-operation
[Objective] In the new round of metro politan rail transit integration construction, enhancing train through-operation is crucial for reducing passenger interchange time. Cross-system intercity railway through-operation...
Reliability Analysis of Tram Electro-mechanical Braking System Based on Fuzzy Fault Tree
Objective The electro-mechanical braking system architecture of tram is different from that of the traditional braking system, so it is necessary to analyze the system safety and make targeted improvement to its weak lin...
Study on Flow Plasticity and Permeability of Mixture Conditioned Muck for Metro Shield Tunnel in Water-rich Sand Stratum
[Objective] When tunnel boring machine advancing in the water-rich sand layer, problems such as high cutter torque, serious wear and spout of the screw conveyer can be easily generated. In order to ensure the safety of c...
Optimization of Mecca Light Rail Train Organization during Peak Hours Based on Virtual Formation Technology
Objective With the annual increase of pilgrim flow in Mecca, the throughput capacity of Makkah Metro Pink Line (simplified as Mecca light rail) operation plan during peak hours is saturated. Therefore, it is aimed to exp...