Research on the Settlement Law of the Ground and Existing Stations in the Close Under-crossing Construction of Subway Station
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10
Abstract
Objective As the development and utilization of urban underground space advances towards the three-dimensional and multi-dimensional direction, there are more and more over-crossing and under-crossing urban rail transit projects. Among them, the close under-crossing construction of new stations with large cross-section has a significant impact on the surrounding environment. Therefore, it is urgent to carry out an in-depth study on the ground settlement and deformation law of existing stations during the new station construction process closely under-crossing existing stations by Pile-Beam-Arch (PBA) method. Method Based on the actual engineering case of Beijing Metro Line 6 Pinguoyuan Station, which closely under-crosses the existing station with same name on Metro Line 1, the law of ground settlement and deformation of the existing station is analyzed by adopting numerical simulation method in the study. By comparing the actual monitoring data, the actual situation of ground settlement and deformation of the existing station during the construction process is further verified, and the numerical simulation results are compared and analyzed with the measured data. Result & Conclusion The most unfavorable stages for ground settlement and existing structure deformation are the guide hole excavation stage and the second lining arch stage of PBA method. After the completion of second lining arch construction, both the ground settlement and the deformation of the existing structure show rebound phenomenon. In addition, the stiffness of the existing station has a significant inhibiting effect on the ground settlement above, which is manifested in the fact that the ground settlement value of the overlapping section is smaller than that of the non-overlapping section. The deformation of the existing station structure caused by new station constructed with PBA method is mainly the rigid body displacement, while it caused track structure deformation is mainly the overturning deformation, which is locally manifested as rigid body displacement.
Authors and Affiliations
Mingyang XU, Haitao WANG, Jiangtao TIAN, Zhiwei ZHANG, Qiang YOU
Application and Exploration of Underground Excavation Technology in Shanghai Rail Transit Stations
Objective With years of development, Shanghai urban rail transit is now facing an extremely complex and demanding construction environment. Issues such as traffic congestion, housing demolition, and pipeline relocation c...
Reasonable Energy Consumption Correction Method for Ventilation and Air-conditioning of Platform Screen Door Metro Stations in China
Objective In view of the continuous growth of energy consumption in metro stations, in order to accurately evaluate their current energy consumption level, tap energy conservation potential and promote energy conservatio...
Fault Analysis and Optimization Scheme of Insufficient Air Braking in Metro Train
[Objective] Currently, when metro trains operate on mainline tracks under the ATO (automatic train operation) mode and stop at stations, the rail transit signaling system must confirm that all braking signals are appli...
Research on Intelligent Identification of Worker′s Unsafe Behavior in Urban Rail Transit Based on Convolutional Neural Network Algorithm
[Objective] Worker′s unsafe behavior is the fundamental factor in urban rail transit construction accidents. As the traditional management mode is insufficient in restraining the workers from the unsafe behavior, it is n...
Deformation Effect Analysis of Shield Tunnel Closely Side-passing Viaduct Pile Foundation
Objective Shield tunneling may cause displacement and deformation of the nearby viaduct foundation and reduce its bearing capacity. Therefore, the deformation effect caused by shield tunnel closely side-passing viaduct f...