Research on the Settlement Law of the Ground and Existing Stations in the Close Under-crossing Construction of Subway Station
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10
Abstract
Objective As the development and utilization of urban underground space advances towards the three-dimensional and multi-dimensional direction, there are more and more over-crossing and under-crossing urban rail transit projects. Among them, the close under-crossing construction of new stations with large cross-section has a significant impact on the surrounding environment. Therefore, it is urgent to carry out an in-depth study on the ground settlement and deformation law of existing stations during the new station construction process closely under-crossing existing stations by Pile-Beam-Arch (PBA) method. Method Based on the actual engineering case of Beijing Metro Line 6 Pinguoyuan Station, which closely under-crosses the existing station with same name on Metro Line 1, the law of ground settlement and deformation of the existing station is analyzed by adopting numerical simulation method in the study. By comparing the actual monitoring data, the actual situation of ground settlement and deformation of the existing station during the construction process is further verified, and the numerical simulation results are compared and analyzed with the measured data. Result & Conclusion The most unfavorable stages for ground settlement and existing structure deformation are the guide hole excavation stage and the second lining arch stage of PBA method. After the completion of second lining arch construction, both the ground settlement and the deformation of the existing structure show rebound phenomenon. In addition, the stiffness of the existing station has a significant inhibiting effect on the ground settlement above, which is manifested in the fact that the ground settlement value of the overlapping section is smaller than that of the non-overlapping section. The deformation of the existing station structure caused by new station constructed with PBA method is mainly the rigid body displacement, while it caused track structure deformation is mainly the overturning deformation, which is locally manifested as rigid body displacement.
Authors and Affiliations
Mingyang XU, Haitao WANG, Jiangtao TIAN, Zhiwei ZHANG, Qiang YOU
Simulation Analysis of Passenger Evacuation and Rescue in Straddle Monorail Transit Intervals
Objective Due to the unique characteristics of straddle monorail transit system, evacuation and rescue forms on its elevated lines differ from conventional urban rail transit. Therefore, it is necessary to conduct an in-...
Research on Metro Vehicle Wheel Wear and Reprofiling Strategy
Objective Wheel wear directly affects the vibration environment of metro vehicles. Severe abnormal wear can lead to structural fatigue exceeding the limit, reducing the safety of train operation. Therefore, it is necessa...
Toe Load Detection and Test Verification Based on the Natural Frequency of Fastener Elastic Rod
Objective The insufficient toe load of the fastener elastic rod will induce loosening of the surrounding fasteners, aggravate the dynamic response between wheels and rails, affecting the service life of the track compone...
Correlation Analysis of Evaluation Indicators for Shield Tail Sealing Grease Waterproof Performance
Objective The performance of shield tail grease significantly influences the effectiveness of the shield tail waterproof seal. While there are numerous performance indicators for shield tail grease, the relationship betw...
Optimal Algorithm of Tram Section Energy-saving Speed Curve under Fixed Time Constraint
Objective Calculation of tram operation control scheme taking into account energy consumption requires a great deal of calculation of the energy-saving speed profile. In order to establish an accurate and efficient optim...