Research on the Settlement Law of the Ground and Existing Stations in the Close Under-crossing Construction of Subway Station

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10

Abstract

Objective As the development and utilization of urban underground space advances towards the three-dimensional and multi-dimensional direction, there are more and more over-crossing and under-crossing urban rail transit projects. Among them, the close under-crossing construction of new stations with large cross-section has a significant impact on the surrounding environment. Therefore, it is urgent to carry out an in-depth study on the ground settlement and deformation law of existing stations during the new station construction process closely under-crossing existing stations by Pile-Beam-Arch (PBA) method. Method Based on the actual engineering case of Beijing Metro Line 6 Pinguoyuan Station, which closely under-crosses the existing station with same name on Metro Line 1, the law of ground settlement and deformation of the existing station is analyzed by adopting numerical simulation method in the study. By comparing the actual monitoring data, the actual situation of ground settlement and deformation of the existing station during the construction process is further verified, and the numerical simulation results are compared and analyzed with the measured data. Result & Conclusion The most unfavorable stages for ground settlement and existing structure deformation are the guide hole excavation stage and the second lining arch stage of PBA method. After the completion of second lining arch construction, both the ground settlement and the deformation of the existing structure show rebound phenomenon. In addition, the stiffness of the existing station has a significant inhibiting effect on the ground settlement above, which is manifested in the fact that the ground settlement value of the overlapping section is smaller than that of the non-overlapping section. The deformation of the existing station structure caused by new station constructed with PBA method is mainly the rigid body displacement, while it caused track structure deformation is mainly the overturning deformation, which is locally manifested as rigid body displacement.

Authors and Affiliations

Mingyang XU, Haitao WANG, Jiangtao TIAN, Zhiwei ZHANG, Qiang YOU

Keywords

Related Articles

Application of Distributed Photovoltaic Power Generation at Urban Rail Transit Station Entrances and Exits

Objective Based on the goals of carbon peak and carbon neutrality in China and the demand for green, low-carbon and sustainable development of urban rail transit, the feasibility of applying distributed photovoltaic powe...

Study on Key Protocols of Shanghai Metro B-TrunC Network Interconnection

[Objective] The B-TrunC (broadband trunking communication) network of Shanghai Metro adopts the architecture of multi-line shared hot standby trunking core network, which needs access to the base stations and terminals o...

Simulation Analysis of Jet Noise from High-speed Railway EMU Main Circuit Breaker Switching Valve and Noise Reduction Measures

Objective The jet noise generated by the main circuit breaker switching valve of high-speed railway EMU is excessively high, which seriously affects passenger comfort. Therefore, it is essential to study effective noise...

Research on Vehicle Wheelset Wear Model Based on Measured Data

Objective Based on the measured data of the train wheelsets on Shanghai Metro Line 17, the wheelset wear pattern is studied, and a wear model of wheel rim thickness and wheel diameter is established to improve the safety...

Toe Load Detection and Test Verification Based on the Natural Frequency of Fastener Elastic Rod

Objective The insufficient toe load of the fastener elastic rod will induce loosening of the surrounding fasteners, aggravate the dynamic response between wheels and rails, affecting the service life of the track compone...

Download PDF file
  • EP ID EP749215
  • DOI 10.16037/j.1007-869x.2024.10.012
  • Views 61
  • Downloads 0

How To Cite

Mingyang XU, Haitao WANG, Jiangtao TIAN, Zhiwei ZHANG, Qiang YOU (2024). Research on the Settlement Law of the Ground and Existing Stations in the Close Under-crossing Construction of Subway Station. Urban Mass Transit, 27(10), -. https://europub.co.uk/articles/-A-749215