Research on the Settlement Law of the Ground and Existing Stations in the Close Under-crossing Construction of Subway Station
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 10
Abstract
Objective As the development and utilization of urban underground space advances towards the three-dimensional and multi-dimensional direction, there are more and more over-crossing and under-crossing urban rail transit projects. Among them, the close under-crossing construction of new stations with large cross-section has a significant impact on the surrounding environment. Therefore, it is urgent to carry out an in-depth study on the ground settlement and deformation law of existing stations during the new station construction process closely under-crossing existing stations by Pile-Beam-Arch (PBA) method. Method Based on the actual engineering case of Beijing Metro Line 6 Pinguoyuan Station, which closely under-crosses the existing station with same name on Metro Line 1, the law of ground settlement and deformation of the existing station is analyzed by adopting numerical simulation method in the study. By comparing the actual monitoring data, the actual situation of ground settlement and deformation of the existing station during the construction process is further verified, and the numerical simulation results are compared and analyzed with the measured data. Result & Conclusion The most unfavorable stages for ground settlement and existing structure deformation are the guide hole excavation stage and the second lining arch stage of PBA method. After the completion of second lining arch construction, both the ground settlement and the deformation of the existing structure show rebound phenomenon. In addition, the stiffness of the existing station has a significant inhibiting effect on the ground settlement above, which is manifested in the fact that the ground settlement value of the overlapping section is smaller than that of the non-overlapping section. The deformation of the existing station structure caused by new station constructed with PBA method is mainly the rigid body displacement, while it caused track structure deformation is mainly the overturning deformation, which is locally manifested as rigid body displacement.
Authors and Affiliations
Mingyang XU, Haitao WANG, Jiangtao TIAN, Zhiwei ZHANG, Qiang YOU
Planning Scheme of Shenzhen Airport East Comprehensive Transportation Hub for Air-Rail Intermodal Integration
Objective In recent years, China actively promotes the development of air-rail intermodal transportation. However, as a complex system with aviation and high-speed rail two major external transportation modes meeting, th...
Mechanical Behavior of Urban Rail Transit Station Structure Based on Existing Shield Tunnel Interval Underground Excavation Construction
Objective Cancer Hospital Station on Shenzhen Rail Transit Line 14 adopts a scheme of large-diameter (8.5 m) shield tunnel expansion featuring tunnel-first and station-later. During the connection of the main station str...
Train Vehicle Nose Design Combining Shape Grammar and Interactive Genetic Algorithm
Objective The typical train nose aesthetic design method generally relies on the subjective experience and intuition of designers, and can no longer meet the design and production needs of rapid iteration and mass custom...
Temperature Field Development Characteristics of Frozen Method Construction for Metro Link Passages in Shanghai Soft Soil Stratum
[Objective] In order to predict the development of the frozen wall before the frozen method construction and validate the rationality of the design, providing a scientific guidance for engineering construction, it is nec...
Cause Analysis and Improvement Measures for Maglev Train Brake Release Failure in Beijing Subway Line S1
Objective The maglev train of Beijing Subway Line S1 had a brake release failure during operation, impacting line normal operation. Therefore, it is necessary to find out the exact cause of the fault and put forward impr...