Research on Upgrade and Transformation of Centralized Signal Control Equipment in Main Substation of Urban Rail Transit

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 3

Abstract

[Objective] At present, the signal equipment in stations of Shanghai Metro Line 7 enters the aging cycle, which directly affects the stability and reliability of the power supply system of Line 7. It is necessary to upgrade the signal equipment on the premise of ensuring that the function of the centralized signal control equipment in the main substation remains the same. [Method] With Shanghai Metro Line 7 as the research object, the function of the centralized signal control equipment in the main substation is introduced. On the premise that the original functions are not affected, the transformation principle of hardware platform consistency and software functionality consistency is proposed. The hardware transformation of the equipment is introduced mainly from the aspects of centralized signal cabinet, protection and measurement device in 110 kV main substation, and serial port signal of comprehensive protection equipment. The new engineer workstation based on Unix system is introduced. The centralized signal control equipment in the main substation is debugged and its functions are verified. [Result & Conclusion] The debugging results and function verification show that the new centralized signal control equipment is functionally compatible with the existing equipment, the signal delay and false alarm caused by the aging of the original equipment are eliminated, and the transformation requirements are met.

Authors and Affiliations

Wenhao CHEN

Keywords

Related Articles

Research on Site Selection of Emergency Rescue Station in Urban Rail Transit Line Network Based on P-center Model

Objective With the expansion of urban rail transit line network, the system risks become more complicated and uncontrollable. In order to improve the emergency rescue capability of urban rail transit system, site selecti...

Design of Grounding Grid for Main Substations in High Soil Resistivity Areas Based on CDEGS Software

Objective To address the difficulty of reducing the grounding resistance of main substations in high soil resistivity areas, it is necessary to study the design of grounding grids for main substations in such regions. Me...

Analysis of the Digital-Intelligent Development of Medium and Low Capacity Rail Transit System

Objective With the rapid development of rail transit technology and intelligent improvement of urban public transportation, the digital and intelligent concept extends and spreads widely in urban rail transit system, gra...

Docking Scheme of Shanghai Rail Transit Technical Security System with External Systems

Objective To meet the requirements of external entities for accessing video surveillance images from Shanghai rail transit system, and to ensure the normal, stable and secure transmission of these images, it is necessary...

Impact Analysis of Arch Vault Rise-span Ratio on Steel Pipe Pile Stress and Land Subsidence in Urban Rail Transit Covered PBA Method Stations

Objective The arch vault rise-span ratio not only affects the building height, design rationality, and construction safety of covered PBA (pile-beam-arch) method urban rail transit stations. Therefore, it is necessary to...

Download PDF file
  • EP ID EP732809
  • DOI 10.16037/j.1007-869x.2024.03.035
  • Views 50
  • Downloads 0

How To Cite

Wenhao CHEN (2024). Research on Upgrade and Transformation of Centralized Signal Control Equipment in Main Substation of Urban Rail Transit. Urban Mass Transit, 27(3), -. https://europub.co.uk/articles/-A-732809