Resource Constrained Project Scheduling Problems - A Review Article

Journal Title: International Journal of Science and Research (IJSR) - Year 2015, Vol 4, Issue 3

Abstract

The science of construction scheduling has gained importance in the past few decades and has become the focal point of construction management practitioners. Scheduling involves listing of a project's milestones, activities, and deliverables with intended start and finish dates. These are estimated in terms of resource allocation, budget and duration. Resource limits (manpower, machinery, materials and money) are practical constraints that exist in most projects and it limits a constructor’s ability to execute and deliver a project as originally planned. The resource-constrained single project scheduling problem (RCPSP) as well as resource-constrained multi-project scheduling problem (RCMPSP) has become a well-known standard problem in project scheduling and has attracted numerous researchers from multiple areas. This article reviews the various approaches adopted like Ant Colony Optimization (ACO), Constraint Programming (CP) and Backward-Forward Hybrid Genetic algorithm (BFHGA) and focuses on providing researchers the future scope in this area to look into.

Authors and Affiliations

Keywords

Related Articles

Performance Evaluation of Some Selected Feature Extraction Algorithms in Ear Biometrics

" It has been suggested by the researchers that the structural shape, size and features of the ear are unique for each person and invariant with age, which makes ear a better biometric trait; however, a major problem in...

An Advanced Information Retrieval System of Relational Keyword Search Scheme

In the last few years, a keyword search technique to relational database has been an interesting area of research system within the relational database and information retrieval (IR) system. A huge number of attempts...

The Impact of Performance Appraisal on Organizational Commitment of Bank Employees

The present study investigated the impact of performance appraisal on the organizational commitment of 172 bank employees randomly selected from 10 public sector banks of Uttarakhand state in India. The results of the st...

Toxicity of Organophosphate Insecticide on Relative Body and Liver Weights of Mice

The present study deals with the changes in relative body and liver weights of mice treated with different doses of cythion (Organophosphate insecticide) ranging from 10, 50, 100 and 500mg/kg/day diet. Cythion concentrat...

An Existential Review of Wireless Sensor Networks

An Existential Review of Wireless Sensor Networks

Download PDF file
  • EP ID EP357335
  • DOI -
  • Views 60
  • Downloads 0

How To Cite

(2015). Resource Constrained Project Scheduling Problems - A Review Article. International Journal of Science and Research (IJSR), 4(3), -. https://europub.co.uk/articles/-A-357335