Review on Planning and Scheduling of Construction Project by Management Tool Primavera P6

Abstract

Modern construction system has shown great potential in the field of the conventional construction system. The advantage of using new construction techniques for any type of construction is that the process takes no longer. The modern method of construction is defined as a way of working more effectively to achieve more while using less. The description lends itself heavily to offsite or modular construction techniques the method of prefabricating parts of building offsite before transporting and assembling them at their final location. Unlike traditional methods of construction is defined as a way of working more effectively. Poor construction management will cause the delay. Delay in the contracted project can result in penalties and adversely affect the reputation of the company. It is essential to manage the work within time. If construction time increases, construction cost also increases. It is necessary proper planning and management for construction work. Primavera p6 is a management tool. In this study primavera software help in the planning and scheduling of the project. Primavera gives better quality of project management process and easily understanding results. Shashwat Dubey | Prof. M. C. Paliwal "Review on Planning and Scheduling of Construction Project by Management Tool Primavera P6" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-2 , February 2021, URL: https://www.ijtsrd.com/papers/ijtsrd38641.pdf Paper Url: https://www.ijtsrd.com/engineering/civil-engineering/38641/review-on-planning-and-scheduling-of-construction-project-by-management-tool-primavera-p6/shashwat-dubey

Authors and Affiliations

Shashwat Dubey | Prof. M. C. Paliwal

Keywords

Related Articles

Modern Poetic Trends of Odisha versus the Neoteric Strives of Guruprasad

"This paper tries to bring out the literary trends of Odia literature from nineteenth century to the last part of twentieth century. With reference to the long literary passage of some 175 years attempts have be to intro...

Experimental Study on Properties of Clay Bricks by Adding Cement, Lime and SCBA

Bricks are the artificial stones. These are used in building construction and for ornamental purposes. These are one of the basic materials used for wall construction. These are easily available, cheap and light weighted...

Gas Bubble Tracking During Casting Filling Process

During numerical simulation, one of the biggest challenges is to simulate the smallest air bubbles that can be entrained in the metal. In fact, in common fluid dynamic simulation of casting process filling each time a re...

Hot Spot Temperature Analysis of Transformer using FEM on COMSOL

The transformers are static bits of mechanical assembly with at least two windings, which by electromagnetic enlistment; change an arrangement of substituting voltage and current into another arrangement of voltage and c...

Optimal Allocation Policy for Fleet Management

The transportation problem is one of the biggest problem that face the fleet management, whereas the main objectives for the fleet management is reducing the operations cost besides improving the fleet efficiency. Theref...

Download PDF file
  • EP ID EP694001
  • DOI -
  • Views 124
  • Downloads 0

How To Cite

Shashwat Dubey (2021). Review on Planning and Scheduling of Construction Project by Management Tool Primavera P6. International Journal of Trend in Scientific Research and Development, 5(2), -. https://europub.co.uk/articles/-A-694001