Risk Assessment of Critical Equipment Failure Mode. A Case Study of Olkaria 2 Geothermal Power Plant In Kenya.

Journal Title: IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) - Year 2018, Vol 15, Issue 5

Abstract

Recently in Kenya, there is massive investment in exploration of geothermal energy which is the key source of power to the national grid. However, despite considerable investment in geothermal power sources, in Kenya and many developing countries, few studies address the asset management (maintenance) aspects of existing facilities. Therefore the objective of this paper is to perform risk assessment of critical equipment failure modes in the power plant by using RPN and FMEA techniques. These techniques were considered for determining, classifying and analyzing common failures in the power plant. The first step involved failure data collection, structuring and analysing the reliability data. The next step involved performing risk assessment with a view of prioritizing critical sub-systems and the critical failure modes associated with the critical sub-systems identified. Risk assessment was done by applying RPN and cost-based FMEA analysis where risk is measured in terms of cost of failure of a sub-system. As a result, an appropriate risk scoring of occurrence, detection and severity of failure modes and computing the Risk Priority Number (RPN) for detecting critical sub system failure is achieved. FMEA technique was then applied to determine the critical failure modes for the critical sub systems identified using RPN. The study found out that the critical sub systems experiencing frequent failures were gear reducer, hot well motors and vacuum pumps. The failure costs associated with these sub systems upon downtime are USD 19,930.67, USD 12,911.27 and USD 8,651.20 respectively.

Authors and Affiliations

Koech D. C, Muchiri Peter, Chemweno Peter

Keywords

Related Articles

Design and Development of an Innovative Hubless Wheel

the aim of this project is to design and build an innovative hubless wheel. The hubless wheel will be self driven by a prime mover like a DC motor. The wheel will have three planetary rollers which will be powered by two...

Effect of Calcium Salts on the Index Properties of Expansive and Non Expansive Soils In The Presence Of Bagasse Ash and Lime

Index properties of soils are greatly associated with fine grained soils and the amount of water present in them. Liquid limit, Plastic limit and Shrinkage limit are the important water content parameters and the changes...

Risk Assessment of Critical Equipment Failure Mode. A Case Study of Olkaria 2 Geothermal Power Plant In Kenya.

Recently in Kenya, there is massive investment in exploration of geothermal energy which is the key source of power to the national grid. However, despite considerable investment in geothermal power sources, in Kenya and...

Empirical Study of Productivity KPIs’ In a Tannery Industry: Case Study.

Productivity is a measure of the effective use of resources.It is the relationship between result and the time it takes to achieve the results. Leather processing is a high labour intensity process of converting hides an...

Evaluation of Seismic Response Modification Factor of Multistory Buildings DesignedAccording to Egyptian Code

This study is mainly concerned with the calculation of the values of response modification factor at failure for idealized reinforced concrete moment resisting multistory frame systems designed according to the Egyptian...

Download PDF file
  • EP ID EP438543
  • DOI 10.9790/1684-1505026373.
  • Views 37
  • Downloads 0

How To Cite

Koech D. C, Muchiri Peter, Chemweno Peter (2018). Risk Assessment of Critical Equipment Failure Mode. A Case Study of Olkaria 2 Geothermal Power Plant In Kenya.. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 15(5), 63-73. https://europub.co.uk/articles/-A-438543