Risk Assessment of High-grade Highway Construction Based on Combined Weighting and Fuzzy Mathematics
Journal Title: Journal of Civil and Hydraulic Engineering - Year 2024, Vol 2, Issue 1
Abstract
High-grade highways are an important part of the modern comprehensive transportation system. However, due to frequent natural disasters, harsh meteorological conditions, and fragile geological environments, high-grade highway construction projects face significant risks, and how to specifically manage and control these construction risks to reduce them to a socially acceptable level has become a pressing technical issue. Therefore, this study combines the construction characteristics and risk features of high-grade highways, applies the Hall's three-dimensional structural theory to comprehensively identify potential risk factors from the dimensions of time, structure, and logic, and builds the logical dimension from four aspects: people, materials, environment, and management. To filter the main influencing factors, the Delphi method is adopted to construct a risk assessment indicator system, with the expert opinions fully taken into consideration. To address the subjectivity in the weight calculation process of risk assessment indicators, the Analytic Hierarchy Process (AHP) and Entropy Weight Method are used to calculate the subjective and objective weights, respectively. A combined weighting model is established based on game theory principles and is used to optimize the weights of the risk assessment indicators. In view of the fuzziness of risks during high-grade highway construction, fuzzy mathematics theory is introduced to construct the risk assessment model. In this study, this method is applied to the construction of the Elsiyah Highway to clarify the risk level of the project and propose targeted control measures. The results show that the risk level of the Elsiyah Highway project is relatively high. The risk level is conditionally acceptable, but measures must be taken to reduce the risks.
Authors and Affiliations
Wei Wu, Mengmeng Ma, Xuezhong Hu, Bo Xu, Yufei Chen, Yutie Jiao, Zongkun Li, Wei Ge, Pieter Van Gelder
Assessment of Fatigue Life in H-Type Bridge Hangers Subjected to Torsional Vibration
The fatigue life of H-type rigid hangers, crucial components in bridge engineering, is investigated in this study, particularly under the influence of torsional vibrations induced by wind loads. These hangers, integral t...
Evaluation of Rainwater Harvesting and Bio-pore Infiltration Holes for Flood Mitigation and Soil Conservation
Rainwater harvesting (RH) techniques, specifically the implementation of Bio-pore Infiltration Holes (BIH), have been investigated as cost-effective and practical methods for managing surface runoff and mitigating flood...
An Intelligent Recording Method for Field Geological Survey Data in Hydraulic Engineering Based on Speech Recognition
Field data collection is a crucial component of geological surveys in hydraulic engineering. Traditional methods, such as manual handwriting and data entry, are cumbersome and inefficient, failing to meet the demands of...
Optimization of Rainwater-Harvesting Dam Placement in Iraq’s Western Desert: A GIS and Mathematical Modeling Approach
This study introduces a novel methodology for optimizing the design of small dams in the Western Desert of Iraq, a region characterized by its vast expanse and significant flood water influx, particularly in the Horan Va...
Regression Model for the Mechanical Properties of PVC-P Geomembranes with Scratch Damage
In response to the mechanical performance alterations of PVC-P geomembranes due to improper handling or subgrade particle action during construction and operation, a series of axial tensile tests on PVC-P geomembranes wi...