RISK MANAGEMENT IN CONSTRUCTION PROJECTS IN ACCORDANCE WITH PRINCE2 METHODOLOGY

Journal Title: Scientific Journal of the Military University of Land Forces - Year 2010, Vol 157, Issue 3

Abstract

Risk management is a procedure that is relatively difficult to implement in construction industry. However, the random nature of phenomena influencing construction production encourages one to carry out more insightful analyses of this issue. The scope of the paper covers a brief description of one of the most widely used methodologies: PRINCE2. Risk management is emphasised against the processes constituting the pillars of that methodology. Attention is focused on the possibility to use the so-called Risk Register within construction projects to produce lists of risk and their description, to determine potential loss and to put forward proper responses (strategies of risk).

Authors and Affiliations

Maciej GÓRSKI, Dariusz SKORUPKA, Agnieszka DZIADOSZ

Keywords

Related Articles

BADANIA NISKOCYKLOWE DWUTEOWNIKÓW STALOWYCH WYKORZYSTYWANYCH DO BUDOWY MOSTÓW NISKOWODNYCH CZ. II

Analiza naprężeń normalnych (odkształceń) pod wierzchołkiem szczeliny przy użyciu tensometrów oporowych daje zadawalające efekty. Obserwacja wzrostu odkształceń względnych pod szczeliną umożliwia przewidzenie powstania u...

ARMIA A NOWA JAKOŚĆ ŁADU SPOŁECZNEGO

Głównym celem niniejszego artykułu jest przedstawienie roli armii w kreowaniu ładu społecznego na świecie. Mając na uwadze fundamentalne zadania armii funkcjonującej w ramach struktur państwowych, autor zwrócił uwagę na...

BETWEEN PARLIAMENTARISM AND A PRESIDENTIAL SYSTEM MODEL – REASONS AND CONSEQUENCES OF THE RADICAL REORIENTATION OF ASSUMPTIONS UNDERLYING THE POLITY OF THE POLISH STATE IN THE INTERWAR PERIOD FROM THE PERSPECTIVE OF ITS SECURITY.

The paper represents an attempt to analyse the reasons and consequences of the radical refocusing of the Polish state’s system in the interwar period. The thesis was advanced that in the interwar period in Poland two fun...

UKŁAD WARSZAWSKI 1955 - 1991

W treści artykułu wskazano na ważniejsze wydarzenia w dziejach Układu Warszawskiego mające wpływ na jego funkcjonowanie i strukturę wewnętrzną. Omówiono także zmieniające się koncepcje wojenne. Wskazano również na rolę i...

OPTIMISATION OF SELECTING TRANSPORT MEANS IN BUILDING MATERIALS DEPOT LOGISTICS

The Bellinger’s method presented in the paper is an example of how to use it in depot logistics. The authors focus their considerations on the selection of a forklift which could be used for carrying construction materia...

Download PDF file
  • EP ID EP60981
  • DOI -
  • Views 65
  • Downloads 0

How To Cite

Maciej GÓRSKI, Dariusz SKORUPKA, Agnieszka DZIADOSZ (2010). RISK MANAGEMENT IN CONSTRUCTION PROJECTS IN ACCORDANCE WITH PRINCE2 METHODOLOGY. Scientific Journal of the Military University of Land Forces, 157(3), 41-53. https://europub.co.uk/articles/-A-60981